The impact of a repair subsidy on repair prices, demand and repair company profitability

被引:2
|
作者
Reimann, Marc [1 ,2 ]
机构
[1] Karl Franzens Univ Graz, Inst Operat & Informat Syst, A-8010 Graz, Austria
[2] Northumbria Univ, Dept Mkt Operat & Syst, Newcastle Upon Tyne NE1 8ST, England
关键词
Repair subsidy; Consumer goods; Circular economy; Funding scheme; Repair industry; Repair price; INVENTORY; POLICIES; LOGISTICS; INDUSTRY; SYSTEMS; SERVICE; PRODUCT; COMPETITION; WASTE; MODEL;
D O I
10.1016/j.jclepro.2024.143102
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Repair is a critical contributor towards a more sustainable circular economy by prolonging the lives of consumer products. However, compared with purchasing new products, consumers perceive repair as expensive and inconvenient. Consequently, repair demand is low. To overcome this problem and stimulate demand, public authorities have introduced financial incentives in the form of different funding schemes for electric and electronic products. Clearly the design of these schemes will affect how repair companies set repair prices and how this affects consumer demand for repair. However, at a micro-level, this relationship between repair funding and repair prices as well as demand has not been studied before. In this paper we analyze and compare two designs of a funding scheme for electric and electronic products as implemented in Austria. Using a stylized model, we show that while such schemes lead to increasing prices, they can indeed enhance demand and improve repair company profits. Moreover, we find that preferences of consumers and repair companies with respect to the design of the funding scheme may diverge. Thus, public authorities need to prioritize demand or supply side benefits of the funding scheme.
引用
收藏
页数:8
相关论文
共 50 条
  • [41] AN OPTIMAL POLICY OF INSPECTION FOR A COMPONENT WITH DELAYED REPAIR
    Zhao, Jianmin
    Jia, Xisheng
    EKSPLOATACJA I NIEZAWODNOSC-MAINTENANCE AND RELIABILITY, 2009, (03): : 20 - 23
  • [42] Reverse Logistics with Disassembly, Assembly, Repair and Substitution
    Boutarfa, Y.
    Senoussi, A.
    Brahimi, N.
    2020 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEE IEEM), 2020, : 108 - 112
  • [43] The Effects of the TSOL Knot on the Repair Strength and Gliding Resistance Following Flexor Tendon Repair
    Berry, Charlotte E.
    Mazzucchelli, Lorenzo
    Reisdorf, Ramona L.
    Moran, Steven L.
    Zhao, Chunfeng
    JOURNAL OF BONE AND JOINT SURGERY-AMERICAN VOLUME, 2022, 104 (22): : 2000 - 2007
  • [44] The effect of lifetime buys on warranty repair operations
    Sahyouni, K.
    Savaskan, R. C.
    Daskin, M. S.
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2010, 61 (05) : 790 - 803
  • [45] Maintenance optimization: Application of remanufacturing and repair strategies
    Wakiru, J.
    Pintelon, L.
    Muchiri, P. N.
    Chemweno, P.
    25TH CIRP LIFE CYCLE ENGINEERING (LCE) CONFERENCE, 2018, 69 : 899 - 904
  • [46] Systematic literature review of sustainable repair shops
    Mezafack, Rony Arsene Djeunang
    Di Mascolo, Maria
    Simeu-Abazi, Zineb
    2020 INTERNATIONAL CONFERENCE ON CONTROL, AUTOMATION AND DIAGNOSIS (ICCAD), 2020, : 336 - 341
  • [47] Performance Assessment of Arthroscopic Rotator Cuff Repair and Labral Repair in a Dry Shoulder Simulator
    Dwyer, Tim
    Schachar, Rachel
    Leroux, Tim
    Petrera, Massimo
    Cheung, Jeffrey
    Greben, Rachel
    Henry, Patrick
    Ogilvie-Harris, Darrell
    Theodoropoulos, John
    Chahal, Jaskarndip
    ARTHROSCOPY-THE JOURNAL OF ARTHROSCOPIC AND RELATED SURGERY, 2017, 33 (07): : 1310 - 1318
  • [48] Optimal post-warranty maintenance policy with repair time threshold for minimal repair
    Park, Minjae
    Jung, Ki Mun
    Park, Dong Ho
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2013, 111 : 147 - 153
  • [49] A production-repair inventory model with time-varying demand and multiple setups
    Omar, Mohd
    Yeo, Ivan
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2014, 155 : 398 - 405
  • [50] A model for a production-repair system under a time-varying demand process
    Omar, Mohd
    Yeo, Ivan
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2009, 119 (01) : 17 - 23