Stochastic Unit Commitment Considering Start-Up and Shut-Down Trajectories

被引:0
|
作者
Guerrero-Mestre, Victoria [1 ]
Contreras, Javier [1 ]
机构
[1] Univ Castilla La Mancha, ETS Ingenieros Ind, E-13071 Ciudad Real, Spain
来源
2016 IEEE POWER AND ENERGY SOCIETY GENERAL MEETING (PESGM) | 2016年
关键词
D O I
暂无
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
The aim of this paper is to provide a formulation of the stochastic unit commitment (UC), modeling in detail the operational phases of the thermal units as well as their start-up and shut-down trajectories. A MILP two-stage stochastic model is proposed for the solution of the proposed UC problem, where the uncertainty considered is related to the wind power penetration and the demand consumption. With this formulation, the thermal units can follow the changes in the wind power generation and the demand more accurately.
引用
收藏
页数:5
相关论文
共 50 条