Control Techniques for Cable System Construction of Wufengshan Changjiang River Bridge

被引:0
|
作者
Li, Bing [1 ]
机构
[1] Ma'anshan Yangtze River Bridge Headquarters, Ning'an Railway Co., Ltd., Ma'anshan,243071, China
关键词
Elastic moduli;
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:119 / 126
相关论文
共 50 条
  • [31] Key Foundation Construction Techniques for South Anchorage of Xianxin Road Changjiang River Bridge in Nanjing
    Guo, Jiajia
    Zhang, Guohao
    Zong, Jiaqi
    Li, Jian
    Guo, Shifeng
    Bridge Construction, 2024, 54 (06) : 9 - 15
  • [32] Design of Heavy Cable Crane for Zigui Changjiang River Highway Bridge
    Fang, Nai-Ping
    Xu, Xin
    Wang, Shuai
    Bridge Construction, 2022, 52 (01) : 116 - 123
  • [33] Construction Schemes for Main Bridge of Qingshan Changjiang River Highway Bridge in Wuhan
    Wang, Yin-Feng
    Hu, Jun
    Fang, Li-Jun
    Zhang, Jing
    Bridge Construction, 2020, 50 : 112 - 118
  • [34] Key Construction Techniques for Steel-Concrete Composite Girder of Chibi Changjiang River Highway Bridge
    Zhao, Zi-Long
    Zhang, Dong
    Bridge Construction, 2022, 52 (02): : 11 - 17
  • [35] Construction techniques for bored piles of main pier No. 19 of Qingshan Changjiang River Highway Bridge in Wuhan
    Li, Lin-Shan
    Bridge Construction, 2016, 46 (03) : 6 - 10
  • [37] Construction techniques for upper cross beams of pylons of Huanggang Changjiang River Rail-cum-Road bridge
    Zhang, D.-Z. (357723363@qq.com), 1600, Wuhan Bridge Research Institute (43):
  • [38] Key Highway Deck Replacement Techniques for Jiujiang Changjiang River Bridge
    Cai, Guo-Qiang
    Wang, Ya-Long
    Lou, Song
    Bridge Construction, 2020, 50 (06) : 110 - 115
  • [39] Temperature Control Techniques for Mass Concrete of Pile Caps of Qingshan Changjiang River Highway Bridge in Wuhan
    Wei, Jian-Feng
    Bridge Construction, 2019, 49 : 80 - 85
  • [40] Construction techniques of steel cofferdam for mainpier No. 3 of Tiansheng Port special ship channel bridge of Hutong Changjiang River Bridge
    Zeng, Wei
    Deng, Hua-Ming
    Bridge Construction, 2015, 45 (06) : 101 - 105