Design of PPP Project under Computer Network and Different Capital Structures

被引:0
|
作者
Chen, Shuting [1 ]
机构
[1] School of Business, Central South University, Hunan, Changsha,410083, China
关键词
Internet protocols - Heuristic algorithms - Cost benefit analysis;
D O I
暂无
中图分类号
学科分类号
摘要
In order to address the applicability of the PPP project auction system in the current market, this paper studies the mechanism and related models of PPP projects under different capital structures and improved approach of selecting items only by price, using computer network systems and heuristic algorithms. The electronic reverse auction (ERA) of PPP projects under different capital structures under the diversified environment is established. This paper selects the traditional government procurement model as the reference group. The ERA of PPP projects under the computer network background and different capital structures was selected as the observation group, through the comparative analysis of the procurement cost, the negotiation time cost, the supplier selection range, the project construction efficiency, the project cost, and other aspects. The correlation and feasibility were also tested by a bivariate t test. The results suggest that the system automates PPP project selection, it can realize the optimization of each comprehensive level of the survey project, meet the procurement needs of different funds, improve the procurement efficiency, and reduce procurement costs; in the context of computer networks, the ERA of PPP projects under different capital structures can effectively save the cost of buyers and bidders and improve cost-saving efficiency. Different from the traditional auction mechanism, it is no longer an auction. Even shopping around can make the auctioneer or bidder get best interests. The ERA mechanism developed under the background of this new computer network provides new possibilities and impetus for the further development of the auction mechanism. © 2022 Shuting Chen.
引用
收藏
相关论文
共 50 条
  • [31] The effect of project risk on capital rationing under uncertainty
    Kira, Dennis
    Kusy, Martin
    Rakita, Ian
    Engineering Economist, 2000, 45 (01): : 37 - 55
  • [32] Managing the design of structures in a mega project
    Abeysinghe, R
    Konstantinidis, G
    Lambropoulos, S
    COMPUTER TECHNIQUES FOR CIVIL AND STRUCTURAL ENGINEERING, 1999, : 255 - 263
  • [33] Capital structures matrix: a model for public access to project interpretation
    Wright, Alexandria M.
    Gunderson, Ronald J.
    INTERNATIONAL JOURNAL OF SUSTAINABLE DEVELOPMENT AND WORLD ECOLOGY, 2011, 18 (04): : 316 - 327
  • [34] INTERPRETATION OF DESIGN SCRIBBLES IN COMPUTER NETWORK DESIGN
    SHEEHY, N
    IRISH JOURNAL OF PSYCHOLOGY, 1993, 14 (03): : 532 - 534
  • [35] COMPUTER-AIDED AIRCRAFT PROJECT DESIGN
    HITCH, HPY
    AERONAUTICAL JOURNAL, 1977, 81 (794): : 51 - 62
  • [36] Project Management System in Computer Aided Design
    Goryachev, A. A.
    Goryachev, A. V.
    Monakhov, A. V.
    Novakova, N. E.
    PROCEEDINGS OF THE XIX IEEE INTERNATIONAL CONFERENCE ON SOFT COMPUTING AND MEASUREMENTS (SCM 2016), 2016, : 221 - 223
  • [37] Computer Aided Design of RC Structures
    S. M. Shahidul Islam
    A. Khennane
    International Journal of Concrete Structures and Materials, 2013, 7 : 127 - 133
  • [38] Computer Aided Design of RC Structures
    Islam, S. M. Shahidul
    Khennane, A.
    INTERNATIONAL JOURNAL OF CONCRETE STRUCTURES AND MATERIALS, 2013, 7 (02) : 127 - 133
  • [39] A method to evaluate credit risk for banks under PPP project finance
    Wang, Xiuqin
    Shi, Lanmin
    Wang, Bing
    Kan, Mengying
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2020, 27 (02) : 483 - 501
  • [40] Research on Risk Management of Wise Medical Project under the PPP Mode
    Wang, Qian
    Wang, Xiaoyu
    Hou, Li
    PROCEEDINGS OF THE 7TH INTERNATIONAL CONFERENCE ON EDUCATION, MANAGEMENT, INFORMATION AND MECHANICAL ENGINEERING (EMIM 2017), 2017, 76 : 1130 - 1133