共 20 条
- [1] Li Y., Wu Z., Gan Q., Integrated Scheduling of Machines and AGVS in Flexible Manufacturing Environment, China Mechanical Engineering, 12, 4, pp. 447-450, (2001)
- [2] Liu S., Ke Y., An Algorithm for Job Shop Scheduling in Dual Resource Constrained with AGV, China Mechanical Engineering, 18, 15, pp. 1810-1813, (2007)
- [3] Ulusoy G., Bilge U., Simultaneous Scheduling of Machines and Automated Guided Vehicles, International Journal of Production Research, 31, 12, pp. 2857-2873, (1993)
- [4] Umit B., Ulusoy G., Time Window Approach to Simultaneous Scheduling of Machines and Material Handling System in an FMS, Operations Research, 43, 6, pp. 1058-1070, (1995)
- [5] Ulusoy G., Sivrikaya-Serifoglu F., Umit B., A Genetic Algorithm Approach to the Simultaneous Scheduling of Machines and Automated Guided Vehicles, Computers & Operations Research, 24, 4, pp. 335-351, (1997)
- [6] Abdelmaguid T.F., Nassef A.O., Kamal B.A., Et al., A Hybrid GA/Heuristic Approach to the Simultaneous Scheduling of Machines and Automated Guided Vehicles, International Journal of Production Research, 42, 2, pp. 267-281, (2004)
- [7] Zeng C., Tang J., Blocking Job Shop Cell Scheduling with Automated Guided Vehicles, Intelligent Control and Automation, pp. 438-442, (2015)
- [8] Reddy B.S.P., Rao C.S.P., A Hybrid Multi-objective GA for Simultaneous Scheduling of Machines and AGVs in FMS, The International Journal of Advanced Manufacturing Technology, 31, 5, pp. 602-613, (2006)
- [9] Xiao H., Lou P., Yan W., Et al., On-line Scheduling Method for Simultaneous Scheduling of Machines and Automated Guide Vehicles in Flexible Job Shop, Transactions of the Chinese Society for Agricultural Machinery, 44, 4, pp. 280-286, (2013)
- [10] Liu X., Lou P., Qian X., Et al., Multi AGV Scheduling Optimization of Material Distribution Based on Improved Genetic Algorithm, Mechanical Design and Manufacturing Engineering, 3, pp. 16-21, (2015)