Reverse Engineering of Building Layout Plan through Checking the Setting out of a Building on a Site Using 3D Laser Scanning Technology for Sustainable Building Construction: A Case Study

被引:0
|
作者
Kim, Hyunjun [1 ]
Kim, Ju-Yong [1 ]
Shin, Yoonseok [2 ]
机构
[1] Kyonggi Univ, Grad Sch, Dept Architectural Engn, Suwon 16227, South Korea
[2] Kyonggi Univ, Architectural Engn, Suwon 16227, South Korea
基金
新加坡国家研究基金会;
关键词
setting out a building; 3D laser scanning technology; reverse engineering in building construction; sustainable building construction; BIM; MODELS; FRAMEWORK; PROGRESS; SEGMENTATION; METHODOLOGY;
D O I
10.3390/su16083278
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Among smart construction technologies, 3D laser scanning technology is used in a variety of applications, including progress measurement, quantity management, reverse engineering (RE), health monitoring, mechanical electronic plumbing (MEP), and so on, using point clouds data (PCD) in the architecture, engineering, and construction (AEC) field. This technology is one of the important data acquisition technologies in construction status to perform active project management through the complete and accurate three-dimensional and visual judgment of building acts. The surveying work for setting out a building is the first step in constructing a building; the location of the building must match the design plan for a building to be sustainable. This is because, if a location deviation exceeds the permitted range, the building must be demolished and rebuilt. When this happens, sustainable construction management is impossible due to delays in the construction schedule, increased construction costs, waste generation, and so on. The purpose of this study is to investigate a case where the accuracy of setting out a building was measured in the construction stage of a building and the building layout design was modified by RE. Although the foundation construction of the case building was in progress, it was confirmed that the setting out of the building measured using a 3D laser scanner did not match with the building layout plan. Therefore, there was no legal problem even if the layout plan is modified according to the measured results, so the building layout plan was modified through RE. Consequently, it was confirmed that a case building under construction became sustainable through RE, and that sustainable construction management was possible by preventing construction schedule delays, increased construction costs, and waste generation.
引用
收藏
页数:16
相关论文
共 6 条
  • [1] A study on 3D/BIM-based on-site performance measurement system for building construction
    Cha, HeeSung
    Kim, Jun
    JOURNAL OF ASIAN ARCHITECTURE AND BUILDING ENGINEERING, 2020, 19 (06) : 574 - 585
  • [2] Providing real-estate services through the integration of 3D laser scanning and building information modelling
    Mahdjoubi, Lamine
    Moobela, Cletus
    Laing, Richard
    COMPUTERS IN INDUSTRY, 2013, 64 (09) : 1272 - 1281
  • [3] R-C-C fusion classifier for automatic damage detection of heritage building using 3D laser scanning
    Seo, Hyungjoon
    JOURNAL OF CIVIL STRUCTURAL HEALTH MONITORING, 2025, 15 (03) : 927 - 941
  • [4] Geometric Quality Assessment of Prefabricated Steel Box Girder Components Using 3D Laser Scanning and Building Information Model
    Tan, Yi
    Chen, Limei
    Wang, Qian
    Li, Shenghan
    Deng, Ting
    Tang, Dongdong
    REMOTE SENSING, 2023, 15 (03)
  • [6] Comparison of Performance Evaluation of Grid-Connected PV System for 3D Single Family House Using Building Information Modeling (BIM) Technology: A Case Study in Elazig, Turkey
    Homood, Abdiljabbar Rafi
    Albarazanch, Salih Habib Najib
    Ekici, Sami
    Ekici, Betul Bektas
    INTERNATIONAL JOURNAL OF RENEWABLE ENERGY RESEARCH, 2020, 10 (04): : 1783 - 1792