共 11 条
- [1] Yang J., Research on generating mechanism and repairing scheme of structural cracks of CRTSⅡ in high speed railway, Journal of Shijiazhuang Tiedao University (Natural Science), 25, 2, pp. 54-58, (2012)
- [2] Cao S., Yang R., Liu X., Et al., Analysis of water pressure in ballastless track crack, Journal of Southwest Jiaotong University, 51, 1, pp. 36-42, (2016)
- [3] Lou L., Xie Y., Xin X., Et al., Study on crack in interface between track slab and wide joint for CRTSⅡ slab-type ballastless track, Railway Engineering, 1, pp. 98-101, (2015)
- [4] Zhao L., Liu X., Zhao H., Et al., The study of influence on track stress caused by the cracking at wide juncture of CRTSⅡ prefabricated slab track, Journal of Railway Science and Engineering, 13, 1, pp. 9-14, (2016)
- [5] Wang P., Xu H., Chen R., Et al., Effects analysis of cracking of CRTSⅡ slab track on subgrade, Journal of Southwest Jiaotong University, 47, 6, pp. 929-934, (2012)
- [6] Huang H., Zeng Y., Xu G., Et al., Effect on longitudinally continuous reinforcing bars' mechanical property caused by the cracking at wide juncture of CRTSⅡ slab ballastless track on bride, Railway Standard Design, 58, 2, pp. 33-36, (2014)
- [7] Wang Y., Wang F., Simulation of bond-slip relationship between concrete and reinforcing bar in ANSYS, Journal of Tianjin University, 39, 2, pp. 209-213, (2006)
- [8] Mccullough B.F., Three-dimensional nonlinear finite element analysis of continuously reinforced concrete pavements, (2000)
- [9] Yuan Q., Guo J., Deng D., Et al., Experimental study on the bonding strength between high modulus cement emulsified asphalt for slab track and concrete, Journal of Railway Science and Engineering, 10, 6, pp. 40-44, (2013)
- [10] Zhong Y., Gao L., Hou B., Interlaminar shear performance of mortar layer in longitudinally connected ballastless track with different arrangement schemes of embedded steel bars, Journal of Southwest Jiaotong University, 52, 6, pp. 1-9, (2017)