Vision-based real-time process monitoring and problem feedback for productivity-oriented analysis in off-site construction

被引:12
作者
Chen, Xue [1 ]
Wang, Yiheng [2 ]
Wang, Jingwen [3 ]
Bouferguene, Ahmed [4 ]
Al-Hussein, Mohamed [1 ]
机构
[1] Univ Alberta, Dept Civil & Environm Engn, Edmonton, AB, Canada
[2] Huazhong Univ Sci & Technol, Sch Civil Engn & Mech, Dept Construct Management, Wuhan, Hubei, Peoples R China
[3] Guangzhou Univ, Sch Mech & Elect Engn, Guangzhou, Guangdong, Peoples R China
[4] Univ Alberta, Campus St Jean, Edmonton, AB, Canada
基金
中国博士后科学基金; 加拿大自然科学与工程研究理事会;
关键词
Computer vision; Off -site construction; Productivity; Real-time process monitoring; Problem feedback; Video analysis; ON-SITE; TRACKING; RECOGNITION; MANAGEMENT; RESOURCES;
D O I
10.1016/j.autcon.2024.105389
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The widespread adoption of surveillance cameras in work environments has enabled the direct and non-intrusive detection of productivity-related issues in the field of construction. In this research, a process monitoring and problem feedback framework is developed based on closed-circuit television footage and computer vision analysis to achieve real-time visual control of the work process and facilitate data-driven decision-making in offsite construction. To enhance the automation of productivity-related problem recognition, a novel video analysis algorithm is developed to process the inputted video footage and provide feedback with respect to nine productivity issues. The z-score and Exponential Moving Average methods are employed to eliminate detection errors, and the spatial density analysis method is adopted to visually analyze spatial information. The observed performance of the proposed framework demonstrates that it can accurately acquire data from footage and provide process monitoring and problem feedback in real time.
引用
收藏
页数:19
相关论文
共 86 条
[1]   Productivity monitoring in building construction projects: a systematic review [J].
Alaloul, Wesam Salah ;
Alzubi, Khalid M. ;
Malkawi, Ahmad B. ;
Al Salaheen, Marsail ;
Musarat, Muhammad Ali .
ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2022, 29 (07) :2760-2785
[2]   Off-Site Construction Planning Using Discrete Event Simulation [J].
Alvanchi, Amin ;
Azimi, Reza ;
Lee, SangHyun ;
AbouRizk, Simaan M. ;
Zubick, Paul .
JOURNAL OF ARCHITECTURAL ENGINEERING, 2012, 18 (02) :114-122
[3]   A New Contour-Based Approach to Moving Object Detection and Tracking Using a Low-End Three-Dimensional Laser Scanner [J].
An, Jhonghyun ;
Choi, Baehoon ;
Kim, Hyunju ;
Kim, Euntai .
IEEE TRANSACTIONS ON VEHICULAR TECHNOLOGY, 2019, 68 (08) :7392-7405
[4]   Off-site construction optimization: Sequencing multiple job classes with time constraints [J].
Arashpour, Mehrdad ;
Wakefield, Ron ;
Abbasi, Babak ;
Lee, E. W. M. ;
Minas, James .
AUTOMATION IN CONSTRUCTION, 2016, 71 :262-270
[5]   Autonomous production tracking for augmenting output in off-site construction [J].
Arashpour, Mehrdad ;
Wakefield, Ron ;
Blismas, Nick ;
Maqsood, Tayyab .
AUTOMATION IN CONSTRUCTION, 2015, 53 :13-21
[6]   Analysis of Disruptions Caused by Construction Field Rework on Productivity in Residential Projects [J].
Arashpour, Mehrdad ;
Wakefield, Ron ;
Blismas, Nick ;
Lee, E. W. M. .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2014, 140 (02)
[7]   Quantification of the State of Practice of Offsite Construction and Related Technologies: Current Trends and Future Prospects [J].
Assaad, Rayan H. ;
El-adaway, Islam H. ;
Hastak, Makarand ;
Needy, Kim LaScola .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2022, 148 (07)
[8]   Process Waste Analysis for Offsite Production Methods for House Construction: A Case Study of Factory Wall Panel Production [J].
Ayinla, Kudirat ;
Cheung, Franco ;
Skitmore, Martin .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2022, 148 (01)
[9]   Applying Basic Control Theory Principles to Project Control: Case Study of Off-Site Construction Shops [J].
Azimi, Reza ;
Lee, SangHyun ;
AbouRizk, Simaan M. .
JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2012, 26 (06) :681-690
[10]   Lean construction and simulation for performance improvement: a case study of reinforcement process [J].
Bajjou, Mohamed Saad ;
Chafi, Anas .
INTERNATIONAL JOURNAL OF PRODUCTIVITY AND PERFORMANCE MANAGEMENT, 2021, 70 (02) :459-487