共 31 条
[21]
YANG Peng, GAO Wei, SUN Jun-qing, Capacity analysis for parallel runway through agent-based simulation, Mathematical Problems in Engineering, 2013, (2013)
[22]
CEM C, ERTAN C, AYDAN C, Et al., Capacity and delay analysis for airport manoeuvring areas using simulation, Aircraft Engineering and Aerospace Technology, 86, 1, pp. 43-55, (2014)
[23]
CETEK F. A., CETEK C., Simulation modelling of runway capacity for flight training airports, Aeronautical Journal, 118, pp. 143-154, (2014)
[24]
IRVINE D, BUDD L C S, PITFIELD D E., A Monte-Carlo approach to estimating the effects of selected airport capacity options in London, Journal of Air Transport Management, 42, pp. 1-9, (2015)
[25]
ZHONG Yu-ming, HAN Song-chen, ZHANG Xu-jing, Design and implementation of aircrafts flowing simulation in airport capacity evaluation, Computer and Communications, 26, 6, pp. 120-123, (2008)
[26]
KANG Rui, YANG Kai, Design and simulation of runway capacity estimation model for feeder airports, Computer Simulation, 33, 3, pp. 32-36, (2016)
[27]
DU Xiao-ming, LIU Yi, Research and application of simulation technology in planning and design of Beijing new airport, Civil Aviation Management, 6, pp. 50-53, (2018)
[28]
HUANG Bao-jun, FANG Xiao-dan, WANG Jie-ning, Risk simulation analysis of runway incursions based on multi agents, Journal of System Simulation, 29, 4, pp. 910-917, (2017)
[29]
FRICKE H, FORSTER S, VOGEL M., Using agent-based modeling to determine collision risk in complex TMA environments: the turn-onto-ILS-final safety case, Aeronautics and Aerospace Open Access Journal, 2, 3, pp. 155-164, (2018)
[30]
VERMA A, TAHLYAN D, BHUSARI S., Agent based simulation model for improving passenger service time at Bangalore airport, Case Studies on Transport Policy, 8, 1, pp. 85-93, (2020)