Exploration of the best time to obtain rock structure information on the palm face during tunnel construction

被引:4
作者
Yan, Zhiqiang [1 ]
Jiang, Feng [1 ]
He, Peng [1 ]
Wang, Gang [1 ,2 ]
Ma, Zhenghu [1 ]
Yang, Chuanxin [1 ]
Han, Weidong [3 ]
Zhao, Ruijie [3 ]
机构
[1] Shandong Univ Sci & Technol, Dept Civil Engn, Qingdao 266590, Peoples R China
[2] Fujian Univ Technol, Coll Civil Engn, Fuzhou 350118, Peoples R China
[3] Shandong Univ, Sch Qilu Transportat, Jinan 250012, Peoples R China
基金
中国博士后科学基金; 中国国家自然科学基金;
关键词
Engineering geology; Engineering surveys; Tunneling; Environmental testing; Dust testing;
D O I
10.1007/s11770-024-1083-x
中图分类号
P3 [地球物理学]; P59 [地球化学];
学科分类号
0708 ; 070902 ;
摘要
Rapid acquisition of rock structure information during tunnel construction is crucial for optimizing subsequent construction strategies and avoiding engineering rock disasters. In this regard, this study proposes the best time to obtain rock structure information on the tunnel face during the construction period. By summarizing relevant studies on rock information acquisition locally and abroad and combining them with the actual situation during the construction of the Lushan Tunnel, this study analyzed the factors affecting the quality of rock information acquisition during the construction period and the approximate range of the optimal timing of acquisition. We also conducted experiments on the concentration of respiratory dust and the concentration of total dust on each section of the Lushan Tunnel construction site and explored the optimal timing of acquiring rock information on the tunnel face by conducting several dust experiments at the construction site. The results showed that the best time to obtain information was before the erection of the steel arch, which was also the best time for the engineers to conduct mechanical characterization of the tunnel face and the lining inspection of the tunnel. The optimal acquisition timing identified in this study is crucial for improving the accuracy of rock information acquisition and guiding subsequent construction programs.
引用
收藏
页码:820 / 834
页数:15
相关论文
共 32 条
[1]   Towards semi-automatic discontinuity characterization in rock tunnel faces using 3D point clouds [J].
Chen, Jiayao ;
Huang, Hongwei ;
Zhou, Mingliang ;
Chaiyasarn, Krisada .
ENGINEERING GEOLOGY, 2021, 291 (291)
[2]   Deep learning based classification of rock structure of tunnel face [J].
Chen, Jiayao ;
Yang, Tongjun ;
Zhang, Dongming ;
Huang, Hongwei ;
Tian, Yu .
GEOSCIENCE FRONTIERS, 2021, 12 (01) :395-404
[3]   Geotechnical and operational applications for 3-dimensional laser scanning in drill and blast tunnels [J].
Fekete, Stephanie ;
Diederichs, Mark ;
Lato, Matthew .
TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2010, 25 (05) :614-628
[4]  
Gao H. Z., 2020, THESIS SW JIAOTONG U
[5]   Structure from Motion photogrammetry to characterize underground rock masses: Experiences from two real tunnels [J].
Garcia-Luna, Ramiro ;
Senent, Salvador ;
Jurado-Pina, Rafael ;
Jimenez, Rafael .
TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2019, 83 :262-273
[6]   Cytotoxicity and genotoxicity of size-fractionated particulate matter collected in underground workplaces [J].
Guerrera, Elena ;
Dominici, Luca ;
Levorato, Sara ;
Vannini, Samuele ;
Acito, Mattia ;
Fatigoni, Cristina ;
Villarini, Milena ;
Moretti, Massimo .
AIR QUALITY ATMOSPHERE AND HEALTH, 2019, 12 (03) :359-367
[7]  
Gui D. B., 2022, THESIS SW JIAOTONG U
[8]  
He P., 2018, THESIS SHANDONG U
[9]   An approach to analyzing the reliability of tunnel surrounding rock rating results considering uncertainty [J].
He, Peng ;
Feng, Si-chen ;
Jiang, Feng ;
Wang, Gang ;
Xiao, Zhi-yong ;
Chen, Yan ;
Zheng, Cheng-cheng .
APPLIED GEOPHYSICS, 2023, 20 (04) :642-667
[10]   Stability analysis of deep-buried hard rock underground laboratories based on stereophotogrammetry and discontinuity identification [J].
Huang, Jing-Zhu ;
Feng, Xia-Ting ;
Zhou, Yang-Yi ;
Yang, Cheng-Xiang .
BULLETIN OF ENGINEERING GEOLOGY AND THE ENVIRONMENT, 2019, 78 (07) :5195-5217