Construction Strategic Project Readiness Assessment

被引:0
作者
Safa M. [1 ]
Weeks K. [2 ]
ELHoubi A. [2 ]
Sharma N. [3 ]
MacGillivray S. [4 ]
机构
[1] Department of Civil and Environmental Engineering, University of Houston, Houston, 77004, TX
[2] College of Business, Lamar University, Beaumont, 77710, TX
[3] Department of Management, University of Delhi, 75/2, Ram Nagar Extension, Delhi
[4] Valency Inc., St, Suite 1, Waterloo, N2V 2B3, ON
关键词
construction; information technology; knowledge management; Project management;
D O I
10.32738/JEPPM-2022-0002
中图分类号
学科分类号
摘要
Proper use of construction strategic management consists of strategic planning for controlling the implementation of strategies during front-end planning (FEP). To improve FEP effort, industry best practice instrument, i.e., Project Definition Rating Index (PDRI) has been used to ensure continued alignment and focus on strategic project priorities. This study proposes a methodology for creating a SWOT (strengths, weaknesses, opportunities, and threats) analysis of big post-mining data from organizations that have implemented PDRI, as a standardized tool used across capital project portfolios. The results show that the proposed methodology has the potential to improve project success when applied as a benchmark of baseline conditions, the element level. Copyright © Journal of Engineering, Project, and Production Management (EPPM-Journal).
引用
收藏
页码:13 / 24
页数:11
相关论文
共 61 条
[51]  
Teixeira F., Cordeiro M. N. D. S., Strengths, weaknesses, opportunities, and threats: computational studies of Mn- and Fe-catalyzed epoxidations, Catalysts, 7, 1, (2017)
[52]  
Turner R., Zolin R., Forecasting success on large projects: developing reliable scales to predict multiple perspectives by multiple stakeholders over multiple time frames, Project Management Journal, 43, 5, pp. 87-99, (2012)
[53]  
Walker A., Project management in construction, (2015)
[54]  
Ward J. A., Project pitfalls, Information System Management, 12, 1, pp. 74-76, (1995)
[55]  
Weeks K., Safa M., Kenyon G., Levius S., Offshore multi-purpose platform efficacy by US coastal areas, Renewable Energy, 152, pp. 1451-1464, (2020)
[56]  
Weerasinghe G., Soundararajan K., Ruwanpura J., LEED-PDRI framework for pre-project planning of sustainable building projects, Journal of Green Building, 2, 3, pp. 123-143, (2007)
[57]  
Willis C. J., Rankin J. H., Demonstrating a linkage between construction industry maturity and performance: a case study of Guyana and New Brunswick, Canadian Journal of Civil Engineering, 39, 5, pp. 565-578, (2012)
[58]  
Yuan H., A SWOT analysis of successful construction waste management, Journal of Cleaner Production, 39, pp. 1-8, (2013)
[59]  
Yuksel I., Dagdeviren M., Using the analytic network process (ANP) in a SWOT analysis–A case study for a textile firm, Information Sciences, 177, 16, pp. 3364-3382, (2007)
[60]  
Zavadskas E. K., Turskis Z., Tamosaitiene J., Selection of construction enterprises management strategy based on the SWOT and multi-criteria analysis, Archives of civil and mechanical engineering, 11, 4, pp. 1063-1082, (2011)