Construction Strategic Project Readiness Assessment

被引:0
作者
Safa M. [1 ]
Weeks K. [2 ]
ELHoubi A. [2 ]
Sharma N. [3 ]
MacGillivray S. [4 ]
机构
[1] Department of Civil and Environmental Engineering, University of Houston, Houston, 77004, TX
[2] College of Business, Lamar University, Beaumont, 77710, TX
[3] Department of Management, University of Delhi, 75/2, Ram Nagar Extension, Delhi
[4] Valency Inc., St, Suite 1, Waterloo, N2V 2B3, ON
关键词
construction; information technology; knowledge management; Project management;
D O I
10.32738/JEPPM-2022-0002
中图分类号
学科分类号
摘要
Proper use of construction strategic management consists of strategic planning for controlling the implementation of strategies during front-end planning (FEP). To improve FEP effort, industry best practice instrument, i.e., Project Definition Rating Index (PDRI) has been used to ensure continued alignment and focus on strategic project priorities. This study proposes a methodology for creating a SWOT (strengths, weaknesses, opportunities, and threats) analysis of big post-mining data from organizations that have implemented PDRI, as a standardized tool used across capital project portfolios. The results show that the proposed methodology has the potential to improve project success when applied as a benchmark of baseline conditions, the element level. Copyright © Journal of Engineering, Project, and Production Management (EPPM-Journal).
引用
收藏
页码:13 / 24
页数:11
相关论文
共 61 条
[41]  
Safa M., An advanced construction supply nexus model, (2013)
[42]  
Safa M., Sabet A., MacGillivray S., Davidson M., Kaczmarczyk K., Gibson G. E., Haas C., Classification of Construction Projects, International Journal of Civil, Environmental, Structural, Construction, and Architectural Engineering, 9, 6, pp. 625-633, (2015)
[43]  
Safa M., Haas C. T., Hipel K. W., Gray J., Front End Planning Tool (FEPT) based on electronic process management, Journal of Construction Engineering and Project Management, 3, 2, pp. 1-12, (2013)
[44]  
Safa M., Sabet A., Ghahremani K., Haas C., Walbridge S., Rail corrosion forensics using 3D imaging and finite element analysis, International Journal of Rail Transportation, 3, 3, pp. 164-178, (2015)
[45]  
Safa M., Shahi A., Haas C. T., Fiander-McCann D., Safa M., Hipel K., MacGillivray S., Competitive intelligence (CI) for evaluation of construction contractors, Automation in Construction, 59, pp. 149-157, (2015)
[46]  
Serrador P., Turner R., The relationship between project success and project efficiency, Project Management Journal, 46, 1, pp. 30-39, (2015)
[47]  
Shahi A., Safa M., Haas C. T., West J. S., Data fusion process management for automated construction progress estimation, Journal of Computing in Civil Engineering, 29, 6, (2014)
[48]  
Shokri S., Safa M., Haas C. T., Haas R. C. G., A conceptual framework to improve information and process management in the execution of capital projects, 3rd International/9th Construction Specialty Conference, pp. 14-17, (2011)
[49]  
Stewart R. A., Mohamed S., Daet R., Strategic implementation of IT/IS projects in construction: a case study, Automation in construction, 11, 6, pp. 681-694, (2002)
[50]  
Sutterfield J. S., Friday-Stroud S. S., Shivers-Blackwell S. L., A case study of project and stakeholder management failures: Lessons learned, Project Management Journal, 37, 5, pp. 26-35, (2006)