共 32 条
- [1] Fan Q X, Zhang C R, Chen W B, Et al., Key technologies of intelligent construction of Wudongde and Baihetan super high arch dams, J Hydroelectr Eng, 38, pp. 22-35, (2019)
- [2] Fan Q, Zhou S, Yang N, Optimization design of foundation excavation for Xiluodu super-high arch dam in China, J Rock Mech Geotechnical Eng, 7, pp. 120-135, (2015)
- [3] Fan Q X., Review of construction management and technical innovation of Xiangjiaba Hydropower Station, Yangtze River, 46, 2, pp. 1-4, (2015)
- [4] Wang S L, Li C G, Shi G C, Et al., Analysis of underground powerhouses in Xiaowan Hydropower Station by elastic-brittle-plastic constitutive models, Chin J Rock Mech Eng, 24, pp. 4449-4454, (2005)
- [5] Wu S, Shen M, Wang J, Jinping hydropower project: Main technical issues on engineering geology and rock mechanics, Bull Eng Geol Environ, 69, pp. 325-332, (2010)
- [6] Fan Q, Zhu H, Chen X, Key issues in rock mechanics of the Three Gorges Project in China, J Rock Mech Geotechnical Eng, 3, pp. 329-342, (2011)
- [7] Tang J F, Xu G Y, Tang X M, Et al., Surrounding rock mass stability analysis by using 3DEC and informational construction of Xiangjiaba underground cavern group, J Hunan Univ Sci Technol (Nat Sci Edit), 24, pp. 67-72, (2009)
- [8] Liu G F, Feng X T, Jiang Q, Et al., Failure characteristics, laws and mechanisms of rock spalling in excavation of large-scale underground powerhouse caverns in Baihetan, Chin J Rock Mech Eng, 35, pp. 865-878, (2016)
- [9] Xiao Y H, Huang X Q, Liu C P, Et al., Study on engineering geological problems of underground powerhouses of Wudongde Hydropower Station, Yangtze River, 46, 14, pp. 1-3, (2015)
- [10] Lu B, Wang J M, Ding X L, Et al., Study of deformation and cracking mechanism of surrounding rock of Jinping I underground powerhouse, Chin J Rock Mech Eng, 29, pp. 2429-2411, (2010)