CHARACTERISTICS ANALYSIS FOR HIGH-RISE BUILDINGS DURING TOP-DOWN CONSTRUCTION

被引:2
作者
Wang, Yuanhang [1 ]
Pan, Xiaoying [2 ]
Xu, Hui [1 ]
Liu, Jinyang [2 ]
Li, Peizhen [2 ]
He, Lingbo [1 ]
Zhang, Wenxin [1 ]
机构
[1] First Construct Co Ltd, China Construct Third Engn Bur Grp, Wuhan 430040, Peoples R China
[2] Tongji Univ, State Key Lab Disaster Reduct Civil Engn, Shanghai 200092, Peoples R China
关键词
top-down method; large area deep foundation pit; dual-purpose diaphragm wall; one column with one pile; finite element analysis; EXCAVATION;
D O I
10.3846/jcem.2024.20818
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
New advances in top-down construction are developing with the construction of supertall buildings in China. This study presents a finite element analysis for high-rise structural construction with a top-down method (TDM) considering complex environmental conditions. Based on this analysis model, the forces and the deformation of the diaphragm wall, beams, and soldier piles at various stages of construction are computed. Taking a super high-rise building with a 5-story basement in Nanjing as an example, the reliability and accuracy of the model is verified by comparing the measured and simulated results of displacement and stress values at various locations. The research results reveal the relationship between excavation depth, soil settlement and pile displacement, which is convenient for finding the optimal construction critical surface. It lays a foundation for the study of the critical height of the subsequent construction and facilitates the prediction of the weak link in the process. At present, this project is under construction, so this study has reference value for subsequent construction projects.
引用
收藏
页码:326 / 342
页数:17
相关论文
共 23 条
[1]  
Cai SH, 2003, Modern steel tube confined concrete structures
[2]   Construction technologies and mechanical effects of the pipe-jacking crossing anchor-cable group in soft stratum [J].
Han, Jianyong ;
Wang, Jun ;
Jia, Dongfeng ;
Yan, Fushun ;
Zhao, Yue ;
Bai, Xiaoyu ;
Yan, Nan ;
Yang, Guang ;
Liu, Dong .
FRONTIERS IN EARTH SCIENCE, 2023, 10
[3]  
Jiangsu Nanjing Geo-Engineering Surveyiec Institute, 2014, Report No. 2014-GK001
[4]   Visualized direct shear test of the interface between gravelly sand and concrete pipe [J].
Li, Tianliang ;
Zhao, Wen ;
Liu, Run ;
Han, Jianyong ;
Jia, Pengjiao ;
Cheng, Cheng .
CANADIAN GEOTECHNICAL JOURNAL, 2024, 61 (02) :361-374
[5]  
Liu Y., 2013, Chin. J. Geotech. Eng, V35, P489
[6]  
Ministry of Housing and Urban-Rural Construction of the People's Republic of China, 2021, DG/TJ 08-2113-2021
[7]  
Ministry of Housing and Urban-Rural Construction of the People's Republic of China, 2013, Technical Specification for Structural Safety Protection of Urban Rail Transit: (CJJ/T202-2013)
[8]  
Ministry of Housing and Urban-Rural Construction of the People's Republic of China, 2011, Code for design of building foundation (GB50007-2011)
[9]  
Ministry of Housing and Urban-Rural Construction of the People's Republic of China, 2018, JGJ 432-2018
[10]  
Ministry of Housing and Urban-Rural Development, 2010, TECHNICAL SPECIFICAT