A Critical Look at the Need for Performing Multi-Hazard Probabilistic Risk Assessment for Nuclear Power Plants

被引:8
作者
Aras, Egemen M. [1 ]
Diaconeasa, Mihai A. [1 ]
机构
[1] North Carolina State Univ, Dept Nucl Engn, Raleigh, NC 27695 USA
来源
ENG | 2021年 / 2卷 / 04期
关键词
probabilistic risk assessment; multi-hazards; nuclear safety; FRAMEWORK;
D O I
10.3390/eng2040028
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Probabilistic Risk Assessment (PRA) is one of the technologies that is used to inform the design, licensing, operation, and maintenance activities of nuclear power plants (NPPs). A PRA can be performed by considering the single hazard (e.g., earthquake, flood, high wind, landslide) or by considering multi-hazards (e.g., earthquake and tsunami, high wind and internal fire). Single hazard PRA was thought sufficient to cover the analysis of a severe accident until the Fukushima Daiichi NPP accident in 2011. Since then, efforts were made to consider multi-hazards as well; thus, multi-hazard PRAs are starting to be seen as being indispensable for NPPs. In addition to the changing frequency of global and local natural hazards, other reasons to be highlighted are that the number and diversity of NPPs will probably increase. Moreover, advanced reactors are close to becoming a reality by designing them with passive safety systems, smaller, standardized, and even transportable to make them cheaper across the design, licensing construction, and operation stages. Thus, multi-hazards should be addressed in any future full-scope PRA. Although we found a few studies discussing multi-hazards, a general framework for multi-hazard PRA is still missing. In this paper, we argue that the starting point for any multi-hazard PRA general framework should be the Advanced Non-LWR Licensing Basis Event Selection (LBE) Approach and Probabilistic Risk Assessment Standard for Non-Light Water Reactor (non-LWR) Nuclear Power Plants. For Probabilistic Risk Assessment (PRA), history has shown us the path forward before, with Three Mile Accident being seen as one milestone to understand the necessity of PRA. The Fukushima Daiichi NPP Accident is another milestone in the development of PRA, showing the need for performing multi-hazard PRA for the current and future NPPs.
引用
收藏
页码:454 / 467
页数:14
相关论文
共 55 条
[1]  
Advances in Small Modular Reactor Technology Developments, 2020, A supplement to: IAEA Advanced Reactors Information System (ARIS)
[2]  
An approach for determining the technical adequacy of probabilistic risk assessment results for risk-informed activities, 2009, U.S. Nuclear Regulatory Commission, Regulatory Guide 1.200
[3]  
[Anonymous], 2013, Seismic Probabilistic Risk Assessment Implementation Guide
[4]  
[Anonymous], 1996, External Man-Induced Events in Relation to Nuclear Power Plant Design: A Safety Guide
[5]  
[Anonymous], 2021, Probabilistic Risk Assessment Standard for Advanced Non-LWR Nuclear Power Plants
[6]  
[Anonymous], 1995, Treatment of External Hazards in Probabilistic Safety Assessment for Nuclear Power Plants: A Safety Practice
[7]   THE CONCEPT OF PROBABILITY IN SAFETY ASSESSMENTS OF TECHNOLOGICAL SYSTEMS [J].
APOSTOLAKIS, G .
SCIENCE, 1990, 250 (4986) :1359-1364
[8]   A new framework for multi-hazards risk aggregation [J].
Bani-Mustafa, Tasneem ;
Zeng, Zhiguo ;
Zio, Enrico ;
Vasseur, Dominique .
SAFETY SCIENCE, 2020, 121 :283-302
[9]   A review of multihazard risk assessment: Progress, potential, and challenges in the application to nuclear power plants [J].
Choi, Eujeong ;
Ha, Jeong-Gon ;
Hahm, Deagi ;
Kim, Min Kyu .
INTERNATIONAL JOURNAL OF DISASTER RISK REDUCTION, 2021, 53
[10]  
Cooper S.E., 2013, P ANS PSA 2013 INT M