Uncertainty Analysis and Application of Source Term under Bypass Release Accident of HPR1000

被引:0
作者
Chang Y. [1 ]
Shi X. [1 ]
Wang H. [1 ]
Wang H. [1 ]
机构
[1] China Nuclear Power Engineering Co., Ltd., Beijing
来源
Hedongli Gongcheng/Nuclear Power Engineering | 2022年 / 43卷 / 05期
关键词
Bypass release category; HPR1000; Source term; Uncertainty analysis;
D O I
10.13832/j.jnpe.2022.05.0070
中图分类号
学科分类号
摘要
The radioactive source term analysis of serious accidents in nuclear power plants is the focus of attention in the field of nuclear safety, and the source term analysis has great uncertainty. In this paper, based on the best estimate plus uncertainty (BEPU) analysis method, HPR1000 serious accident analysis model is established by using the integrated serious accident analysis program. For the first time, from the point of view of the whole accident process, a process suitable for source term uncertainty analysis of HPR1000 serious accident is developed, and this method is used to analyze the source term uncertainty of containment bypass release category. The research content of this paper enriches the source term analysis of the serious accident of HPR1000, and also lays a foundation for the development of the three-level probabilistic safety analysis (PSA) technology of HPR1000. © 2022 Yuan Zi Neng Chuban She. All rights reserved.
引用
收藏
页码:70 / 75
页数:5
相关论文
共 9 条
[1]  
MATTIE P, GAUNTT R, ROSS K, Et al., Uncertainty analysis of the unmitigated long-term station blackout of the peach bottom atomic power station, (2016)
[2]  
ROSS K, BIXLER N, WEBER S, Et al., Uncertainty analysis of the unmitigated short-term station blackout of the Surry power station, Draft Report, (2016)
[3]  
GAUNTT R O, BIXLER N E, WAGNER K C., An uncertainty analysis of the hydrogen source term for a station blackout accident in Sequoyah using MELCOR 1.8. 5, (2014)
[4]  
TIBORCZ L, HOLLANDS T., Uncertainty and sensitivity analysis of the Phébus FPT3 test, Nuclear Engineering and Design, 380, (2021)
[5]  
PARK S, AHN K I, SONG Y M, Et al., Uncertainty analysis of the potential hazard of MCCI during severe accidents for the CANDU6 plant, Science and Technology of Nuclear Installations, 2015, (2015)
[6]  
22, 2, pp. 104-107, (2002)
[7]  
28, 5, pp. 69-74, (2007)
[8]  
37, pp. 93-95, (2016)
[9]  
34, 3, pp. 120-123, (2013)