共 73 条
- [1] Alford C, 1995, AUSTRALAS I MIN MET, V95, P213
- [2] Alford C., 2009, Proceedings of project evaluation conference, Melbourne, P137
- [3] Alford Mining Systems, 2022, AMSStope Shape Optimizer
- [4] [Anonymous], 2017, CPLEX user's manual, P596
- [6] Birge JR, 2011, SPRINGER SER OPER RE, P3, DOI 10.1007/978-1-4614-0237-4
- [7] Optimising declines in underground mines [J]. TRANSACTIONS OF THE INSTITUTION OF MINING AND METALLURGY SECTION A-MINING TECHNOLOGY, 2003, 112 : 164 - 170
- [9] Decline design in underground mines using constrained path optimisation [J]. TRANSACTIONS OF THE INSTITUTIONS OF MINING AND METALLURGY SECTION A-MINING TECHNOLOGY, 2008, 117 (02): : 93 - 99
- [10] Brickey Andrea J., 2015, Underground production scheduling optimization with ventilation constraints