A probabilistic model for evaluating the operational safety and operational safety analysis by the maximum likelihood method: application on the cameroonian company of petroleum depot of garoua

被引:0
作者
Tatsinkou Fogang C. [1 ]
Nzié W. [2 ]
Ngnassi Djami A.B. [2 ]
机构
[1] Department of Mechanical Engineering, National Advanced School of Agro - Industrial Sciences, University of Ngaoundere, Ngaoundere
[2] Department of Fundamental Sciences and Techniques of Enginner, School of Chemical Engeneer and Mineral Industry, University of Ngaoundere, Ngaoundere
关键词
FMECA; Operational safety; Technical Time to Repair; Time between failures; Weibull;
D O I
10.1007/s41872-024-00255-9
中图分类号
学科分类号
摘要
This article presents an operational safety assessment model and analysis in cases where failure rate and repair rate vary over time, using the maximum likelihood analytical method as a method for estimating reliability parameters and uses Gumbel’s graphic paper for the estimation of maintainability parameters. The proposed approach takes into account both reliability and maintainability analyses, unlike current approaches in the literature which perform either reliability or maintainability analyses. A Weibull law for a reliability study has the advantage of being generalized and can also model, under certain conditions, one of the most frequent cases of distribution of technical repair times, namely the logarithmic normal distribution, which lends itself well to comparison with the laws of extreme values. The hypothesis acceptance test used is the Kolmogorov–Smirnov test. The application on the equipment of the Cameroonian Company of Petroleum Depots (CCPD) of Garoua is based on a FMEA analysis and provides parameters and curves after operation of the time between failures and technical times to repair (TTR). © The Author(s), under exclusive licence to Society for Reliability and Safety (SRESA) 2024.
引用
收藏
页码:189 / 206
页数:17
相关论文
共 31 条
[11]  
Kumar A., Malik S.C., Reliability modeling of a computer system with priority to H/W repair over the replacement of H/W and up-gradation of S/W subject to MOT and MRT, Jordan J Mech Ind Eng, 8, 4, pp. 233-241, (2014)
[12]  
Kumar A., Ram M., Reliability measures improvement and sensitivity analysis of a coal handling unit for thermal power plant, Int J Eng Trans C: Aspects, 26, 9, pp. 1059-1066, (2013)
[13]  
Lado A.K., Singh V.V., Ismail K.H., Ibrahim Y., Performance and cost assessment of repairable complex system with two sub-systems connected in series confguration, Int J Reliabil Appl, 19, 1, pp. 27-42, (2018)
[14]  
Lannoy A., Procaccia. Méthodes avancées d’analyse des bases de données du retour d’expérience industriel, Editions Eyrolles, (1994)
[15]  
Laprie J.C., Guide de la sûreté de fonctionnement, (1995)
[16]  
Lloyd K., Lipow M., Reliability, management, methods and mathematics, . in Prentice Hall., (1962)
[17]  
Lyonnet P., Ingénierie de la fiabilité, (2006)
[18]  
Morice E., Quelques problèmes d’estimation relatifs à la loi de Weibull. In Revue de statistique appliquée, Tome, 16, 3, (1968)
[19]  
Fiabilité maintenabilité disponibilité, Recueil Des Normes françaises
[20]  
Niwas R., Garg H., An approach for analyzing the reliability and proft of an industrial system based on the cost-free warranty policy, J Brazil Soc Mech Eng, 40, pp. 1-9, (2018)