Repowering feasibility of Indian wind energy sector: A case study

被引:0
|
作者
Bindu, Aswin Anil [1 ,2 ]
Thampatty, K. C. Sindhu [1 ]
机构
[1] Amrita Vishwa Vidyapeetham, Amrita Sch Engn, Dept Elect & Elect Engn, Coimbatore, Tamil Nadu, India
[2] Amrita Vishwa Vidyapeetham, Amrita Sch Engn, Dept Elect & Elect Engn, Coimbatore 641112, Tamil Nadu, India
关键词
Wind resource assessment; wake loss; repowering; annual energy production (AEP); capacity utilization factor (CUF); WAsP; FARM LAYOUT OPTIMIZATION;
D O I
10.1177/0309524X241238244
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Repowering wind farms entails upgrading or replacing old turbines with more efficient, capable, and profitable ones. This technique has the potential to boost energy production, improve grid integration, and lower operational costs. Repowering also makes use of the most recent breakthroughs in wind energy technology, ensuring that wind farms stay economically viable and contribute to the growth of renewable energy. The majority of the wind farms that are located in India were constructed in early 2000, and their capacity ratings range from 200 kW to 800 kW. The lifespans of these wind farms have finally come to an end. Repowering wind farms is a viable alternative in these regions due to the significant wind capacity that exists there. In order to find the wind potential in the site wind resource assessment is needed. This paper proposes a repowering scheme for the existing wind farm located in Kayathar, Tamil Nadu. The reduction in power loss due to the wake effect in the existing wind farm is analyzed using WAsP software and repowering scheme is proposed to increase the Annual Energy Production (AEP), Capacity Utilisation Factor (CUF). The Wind Atlas Analysis and Application Program (WAsP) is utilized in order to carry out the site's wind resource evaluation. After the wind resource assessment, individual turbine wake loss is identified, and the viability of repowering the wind farm by raising the hub height of high wake-affected turbines was investigated. Another repowering study is also carried out by installing high-capacity turbines in place of the existing turbines.
引用
收藏
页码:911 / 937
页数:27
相关论文
共 50 条
  • [31] On the use of wind energy to power reverse osmosis desalination plant: A case study from Tenes (Algeria)
    Dehmas, Djamila Abdeslame
    Kherba, Nabila
    Hacene, Fouad Boukli
    Merzouk, Nachida Kasbadji
    Merzouk, Mustapha
    Mahmoudi, Hacene
    Goosen, Mattheus F. A.
    RENEWABLE & SUSTAINABLE ENERGY REVIEWS, 2011, 15 (02): : 956 - 963
  • [32] Wind resource assessment around Korean Peninsula for feasibility study on 100 MW class offshore wind farm
    Oh, Ki-Yong
    Kim, Ji-Young
    Lee, Jun-Shin
    Ryu, Ki-Wahn
    RENEWABLE ENERGY, 2012, 42 : 217 - 226
  • [33] The role of wind energy production in addressing the European renewable energy targets: The case of Spain
    Javier Ramirez, F.
    Honrubia-Escribano, A.
    Gomez-Lazaro, E.
    Pham, Duc T.
    JOURNAL OF CLEANER PRODUCTION, 2018, 196 : 1198 - 1212
  • [34] Technical and Economic Perspective for Repowering of Micro Hydro Power Plants: a Case Study of an Early XX Century Power Plant
    Gagliano, A.
    Tina, G. M.
    Nocera, F.
    Patania, F.
    6TH INTERNATIONAL CONFERENCE ON SUSTAINABILITY IN ENERGY AND BUILDINGS, 2014, 62 : 512 - 521
  • [35] Feasibility study for offshore wind power development in India based on bathymetry and reanalysis data
    Nagababu, Garlapati
    Naidu, Natansh K.
    Kachhwaha, Surendra Singh
    Savsani, Vimal
    ENERGY SOURCES PART A-RECOVERY UTILIZATION AND ENVIRONMENTAL EFFECTS, 2017, 39 (05) : 497 - 504
  • [36] An Application of the WAsP Program in Complex, Forested Terrain as Part of a Wind Farm Feasibility Study
    Reutter, Karsten
    Flay, Richard
    McIntosh, Euan
    WIND ENGINEERING, 2005, 29 (06) : 491 - 502
  • [37] Evaluation of wind measurement methods for determination of realistic wind shear: A case study in Aksaray, Turkey
    Kulum, Ekim
    Genc, Mustafa Serdar
    Karagoz, Ferhat
    FLOW MEASUREMENT AND INSTRUMENTATION, 2023, 93
  • [38] Wind Energy Potential Assessment by Weibull Parameter Estimation Using Multiverse Optimization Method: A Case Study of Tirumala Region in India
    Kumar, Mekalathur B. Hemanth
    Balasubramaniyan, Saravanan
    Padmanaban, Sanjeevikumar
    Holm-Nielsen, Jens Bo
    ENERGIES, 2019, 12 (11)
  • [39] Urban wind resource assessment in changing climate: Case study
    Romanic D.
    Rasouli A.
    Hangan H.
    Romanic, Djordje (dromanic@uwo.ca), 1600, SAGE Publications Inc. (41): : 3 - 12
  • [40] Technical feasibility of a photovoltaic power plant on landfills. A case study
    Sangiorgio, Silvia
    Falconi, Marco
    70TH CONFERENCE OF THE ITALIAN THERMAL MACHINES ENGINEERING ASSOCIATION, ATI2015, 2015, 82 : 759 - 765