BIM Implementation in Small and Medium-Sized Companies in the Colombian Construction Sector

被引:0
作者
Osorio-Gomez, Cristian C. [1 ,2 ]
Amariles-Lopez, Cristhian C. [1 ]
Herrera, Rodrigo F. [3 ]
Pellicer, Eugenio [4 ]
机构
[1] Univ Libre, Dept Civil Engn, Bogota, Colombia
[2] Univ Politecn Valencia, Sch Civil Engn, Valencia, Spain
[3] Pontificia Univ Catolica Valparaiso, Sch Civil Engn, Valparaiso, Chile
[4] Univ Politecn Valencia, Sch Civil Engn, Valparaiso, Chile
来源
CONSTRUCTION RESEARCH CONGRESS 2024: CONTRACTING, DELIVERY, SCHEDULING, ESTIMATING, ECONOMICS, AND ORGANIZATIONAL MANAGEMENT AND PLANNING IN CONSTRUCTION | 2024年
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The construction sector has been characterized by having lower productivity than other industries. Construction has been encouraged to improve project performance and promote improvements in the life cycle. BIM is a project management methodology based on virtual construction and collaborative work that allows better integration in the life-cycle project. The main objective of this research is to demonstrate, through a survey, the BIM implementation level in the Colombian construction industry. It was concluded that implementing BIM methodology in Colombia is incipient without a full implementation in the industry. Many enterprises continue to use traditional methods; however, the benefits in companies where it has been implemented are evident. Additionally, statistically significant differences were found in variables like BIM maturity and knowledge, among groups, such as type of enterprise, and organizational levels. Collaborative strategies could be developed to reduce barriers such as lack of knowledge, extra costs, and fear of change.
引用
收藏
页码:569 / 579
页数:11
相关论文
共 47 条
  • [1] An information system for building production management
    Ameziane, F
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2000, 64 (1-3) : 345 - 358
  • [2] Azhar Khalfan, 2012, International Journal of Virtual and Augmented Reality, V11, P1
  • [3] Azhar S., 2011, LEADERSH MANAG ENG, V11, P241, DOI [10.1061/(ASCE)LM.1943-5630.0000127, DOI 10.1061/(ASCE)LM.1943-5630.0000127]
  • [4] Barriers to BIM implementation and ways forward to improve its adoption in the Nigerian AEC firms
    Babatunde, Solomon Olusola
    Udeaja, Chika
    Adekunle, Adedayo Opeyemi
    [J]. INTERNATIONAL JOURNAL OF BUILDING PATHOLOGY AND ADAPTATION, 2021, 39 (01) : 48 - 71
  • [5] Bew M., 2008, Construct IT Autumn
  • [6] Biotto Clarissa Notariano, 2015, Ambient. constr., V15, P79, DOI 10.1590/s1678-86212015000200015
  • [7] Böes Jeferson Spiering, 2021, Ambient. constr., V21, P131, DOI 10.1590/s1678-86212021000200518
  • [8] Building Information Modeling (BIM) Capabilities in the Operation and Maintenance Phase of Green Buildings: A Systematic Review
    Cao, Yu
    Kamaruzzaman, Syahrul Nizam
    Aziz, Nur Mardhiyah
    [J]. BUILDINGS, 2022, 12 (06)
  • [9] Chung S. W., 2019, P 36 INT S AUTOMATIO, P595
  • [10] Criminale A., 2017, 53 ASC ANN INT C P