Solving resource-constrained multi-project environment under different activity assumptions

被引:13
作者
Ben Issa S. [1 ]
Patterson R.A. [2 ]
Tu Y. [1 ]
机构
[1] Schulich School of Engineering, Department of Mechanical and Manufacturing Engineering, University Drive 2500, N.W., Calgary, T2N 1N4, AB
[2] Haskayne School of Business, Business Technology Management, University Drive 2500, N.W., Calgary, T2N 1N4, AB
基金
加拿大自然科学与工程研究理事会;
关键词
ABD activity Assumptions; Limited resource availability; Multi-project scheduling; Resource-sharing;
D O I
10.1016/j.ijpe.2020.107936
中图分类号
学科分类号
摘要
The Resource-Constrained Multi-Project Scheduling Problem (RCMPSP) has been an essential topic of study for the past two decades. This paper presents the generalized RCMPSP(ABD) problem, where category A refers to project activities that can be implemented using fixed resources over fixed durations, category B refers to project activities that can be performed using resources as category A but the non-preemptions are relaxed, and category D refers to project activities that can be executed using flexible resources over flexible durations and may or may not be interrupted. The activity types A, B, or D related to resource utilization and interruptability are known for each activity. After blending the activity types, A, B, and D into the generalized problem, solution heuristics for the RCMPSP(ABD) are presented. Experimental testing shows that substantial reductions in the makespan of the entire project are possible, while also freeing up resources to be used on other projects. A mixed integer-linear program (MILP) formulation is also presented to define this combined problem. This problem has widespread application in practice, for example, in One-of-a-Kind Production (OKP) and construction environments. © 2020 Elsevier B.V.
引用
收藏
相关论文
共 48 条
[21]  
Herroelen W., De Reyck B., Demeulemeester E., Resource-constrained project scheduling: a survey of recent developments, Comput. Oper. Res., 25, 4, pp. 279-302, (1998)
[22]  
Issa S., Tu Y.L., Integrated multi-resource planning and scheduling in an engineering project, Journal of Project Management, 2, 1, pp. 11-26, (2017)
[23]  
Kellenbrink C., Helber S., Scheduling resource-constrained projects with a flexible project structure, Eur. J. Oper. Res., 246, 2, pp. 379-391, (2015)
[24]  
Kolisch R., Sprecher A., PSPLIB-a project scheduling problem library: OR software-ORSEP operations research software exchange program, Eur. J. Oper. Res., 96, 1, pp. 205-216, (1997)
[25]  
Kolisch R., Meyer K., Mohr R., Schwindt C., Urmann M., Ablaufplanung Fur die Leitstrukturoptimierung in der Pharmaforschung, Zeitschrift fur Betriebswirtschaft, 73, 8, pp. 825-848, (2003)
[26]  
Kruger D., Scholl A., A heuristic solution framework for the resource-constrained (multi-) project scheduling problem with sequence-dependent transfer times, Eur. J. Oper. Res., 197, 2, pp. 492-508, (2009)
[27]  
Kuhlmann A., Entwicklung eines praxisnahen project scheduling ansatzes auf der basis von genetischen algorithmen, (2003)
[28]  
Kurtulus I., Davis E.W., Multi-project scheduling: categorization of heuristic rules performance, Manag. Sci., 28, 2, pp. 161-172, (1982)
[29]  
Lourenco H.R., Martin O.C., Stutzle T., Iterated local search, Handbook of Metaheuristics, pp. 320-353, (2003)
[30]  
Lova A., Tormos P., Analysis of scheduling schemes and heuristic rules performance in resource-constrained multi-project scheduling, Ann. Oper. Res., 102, 1-4, pp. 263-286, (2001)