共 16 条
- [1] REYES J N, GROOME J T, LAFI A Y, Et al., Final report for the OSU APEX-CE integral system test facility test results, (2004)
- [2] LIU Yusheng, XU Chao, MA Shuai, Et al., Study on thermal hydraulic phenomena in passive tank of ACME facility, Nuclear Power Engineering, 42, pp. 5-10, (2021)
- [3] XUE Ruojun, DENG Chengcheng, PENG Minjun, Numerical simulation of passive residual heat removal heat exchanger, Atomic Energy Science and Technology, 44, 4, pp. 429-435, (2010)
- [4] PAN Xinxin, Numerical study and sensitivity analysis of PRHR HX transient heat transfer performance, Nuclear Power Engineering, 31, pp. 97-102, (2010)
- [5] CHEN Wei, WANG Meng, DING Tongwei, Numerical simulation of two-phase natural circulation outside tube of C-type tube heat exchanger, Atomic Energy Science and Technology, 48, 9, pp. 1595-1600, (2014)
- [6] JIA Bin, JING Jianping, QIAO Xuedong, Et al., Numerical simulation of PRHR system based on CFD, Nuclear Safety, 12, 3, pp. 37-41, (2013)
- [7] ESTEVEZ-ALBUJA S, JIM-NEZ G, VAZQUEZ RODR GUEZ C., AP1000 IRWST numerical analysis with GOTHIC, Nuclear Engineering and Design, 372, (2021)
- [8] WANG M, HAO Z, ZHANG Y, Et al., Research on the designed emergency passive residual heat removal system during the station blackout scenario for CPR1000, Annals of Nuclear Energy, 45, pp. 86-93, (2012)
- [9] ZOU J, LI Q, TONG L L, Et al., Assessment of passive residual heat removal system cooling capacity, Progress in Nuclear Energy, 70, pp. 159-166, (2014)
- [10] OLATUBOSUN S A, AYODEJI A, AMIDU M A., Safety assessment of AP1000: Common transients, analysis codes and research gaps, Nuclear Engineering and Design, 375, (2021)