Off-design performance of gas turbine power units with alternative load-control strategies

被引:0
|
作者
Pan Z. [1 ]
Lin Z. [1 ]
Fan K. [2 ]
Yang C. [2 ]
Ma X. [2 ]
机构
[1] Guangzhou Zhujiang LNG Power Generation Co., Ltd., Guangzhou
[2] School of Electric Power, South China University of Technology, Guangzhou
关键词
Comparative simulation; Gas turbine; Operating strategy; Part load performance;
D O I
10.32604/EE.2020.013585
中图分类号
学科分类号
摘要
Gas turbine power units, as an effective way to cope with the severe challenge of renewable energy accommodation in power grids, arouse the interest of power enterprises in the deep peak-load regulation performance. Two common alternative load-control strategies including constant turbine inlet temperature (TIT) and constant turbine exhaust temperature (TET) regulations were taken into consideration. To comparatively investigate the part-load performance under these strategies, both mathematical and physical models were set up successively to serve as a validation and complementary to each other. For the mathematical model of compressor with inlet guide vane (IGV), combustor and turbine, stage-stacking method based on blade average geometric parameter, energy con-servation and turbine stage model were adopted respectively. For the physical model, design and off-design analysis were carried out based on GT PRO and THERMOFLEX respectively. The simulation result of mathematical model vali-dated the reliability of the physical model. Based on this, the influence of ambient temperature and different load-regulating strategies on the off-design performance of gas turbine power units was studied in THERMOFLEX. The results in the case of a PG 9351FA gas turbine show that the ambient temperature has a great impact on system performance, i.e., every 5°C increase in the ambient temperature pro-duces a reduction of 3.7% in the relative full-load output and 1.1% in the relative efficiency respectively; when the gas turbine operates under constant TIT strategy, TET starts to rise till it reaches the maximum allowable value with the load rate decreasing, and IGV keeps at the minimum angle with both TIT and TET decreasing when the load rate is lower than 65%; when the gas turbine operates under constant TET strategy, TIT drops slightly at load rate of above 60% while both TIT and TET evidently decrease below 60% load rate operating along the constant corrected speed line at the minimum allowable IGV opening; gas turbine efficiency is greatly affected by load rate and the performance degradation is more obvious especially in lower load rate regions; constant TET strategy is superior in the operating efficiency to constant TIT strategy under part-load conditions. © 2021, Tech Science Press. All rights reserved.
引用
收藏
页码:119 / 141
页数:22
相关论文
共 50 条
  • [21] Off-design performance of a liquefied natural gas plant with an axial turbine of novel endwall design
    Kadhim, Hakim T.
    Rona, Aldo
    APPLIED ENERGY, 2018, 222 : 830 - 839
  • [22] Effective control of steam turbine off-design operation
    2001, Harbin Research Institute (16):
  • [23] The Map Fitting Tool Methodology: Gas Turbine Compressor Off-Design Performance Modeling
    Sethi, Vishal
    Doulgeris, Georgios
    Pilidis, Pericles
    Nind, Alex
    Doussinault, Marc
    Cobas, Pedro
    Rueda, Almudena
    JOURNAL OF TURBOMACHINERY-TRANSACTIONS OF THE ASME, 2013, 135 (06):
  • [24] COMPARATIVE-ANALYSIS OF THE OFF-DESIGN PERFORMANCE FOR GAS-TURBINE COGENERATION SYSTEMS
    KIM, TS
    OH, CH
    RO, ST
    HEAT RECOVERY SYSTEMS & CHP, 1994, 14 (02): : 153 - 163
  • [25] A new approach to off-design performance analysis of gas turbine engines and its application
    Hosseinimaab, S. M.
    Tousi, A. M.
    ENERGY CONVERSION AND MANAGEMENT, 2021, 243
  • [26] Prediction of off-design performance characteristics of a gas turbine cycle using matching technique
    Pathak, M.
    Suresh Kumar, P.
    Saha, U.K.
    International Journal of Turbo and Jet Engines, 2005, 22 (02): : 103 - 119
  • [28] Prediction of off-design performance characteristics of a gas turbine cycle using matching technique
    Pathak, M
    Kumar, PS
    Saha, UK
    INTERNATIONAL JOURNAL OF TURBO & JET-ENGINES, 2005, 22 (02) : 103 - 119
  • [29] Effects of different alternative control methods for gas turbine on the off design performance of a trigeneration system
    Wang, Zefeng
    Han, Wei
    Zhang, Na
    Su, Bosheng
    Gan, Zhongxue
    Jin, Hongguang
    APPLIED ENERGY, 2018, 215 : 227 - 236
  • [30] Power block off-design control strategies for indirect solar ORC cycles
    Casartelli, D.
    Binotti, M.
    Silva, P.
    Macchi, E.
    Roccaro, E.
    Passera, T.
    INTERNATIONAL CONFERENCE ON CONCENTRATING SOLAR POWER AND CHEMICAL ENERGY SYSTEMS, SOLARPACES 2014, 2015, 69 : 1220 - 1230