Solution approach using heuristic and artificial neural networks methods in assembly line balancing problems: A case study in the lighting industry

被引:1
作者
Mumcu, Yelda Karatepe [1 ]
机构
[1] Univ Marmara, Dept Elect & Energy, POB 34865, Istanbul, Turkiye
关键词
Heuristic; A ssembly line balancing; Lighting automation manufacturing; Artificial neural networks; GENETIC ALGORITHM; APPAREL INDUSTRY;
D O I
10.1016/j.heliyon.2024.e26950
中图分类号
O [数理科学和化学]; P [天文学、地球科学]; Q [生物科学]; N [自然科学总论];
学科分类号
07 ; 0710 ; 09 ;
摘要
Assembly line efficiency is one of the most important parameters that determine the overall efficiency of a manufacturing company. The production of a product under optimum conditions is ensured by a balanced assembly. With a balanced assembly line, machinery, material and labour costs are reduced. Within the scope of this research, real data about the daily production capacity and assembly line efficiency of a company producing Emergency Luminaire were taken, the same assembly line was balanced with 4 different Heuristic ALB methods and the results were compared. According to the results obtained, a high line efficiency of 93.955% was achieved using the Hoffman, Comsoal and Moodie&Young (M&Y) methods, and 84.414% was achieved with the Ranked Positional Weight (RPW) method. As a result of this, it was observed that the daily production capacity increased from 250 units to 375 units. As a result of the study, it was revealed that the efficiency of the existing assembly line and accordingly the daily production capacity increased. In addition, the study results of this assembly line were taught to an artificial neural network model for training purposes, and the work station results of the operations of a different assembly line were obtained with 99.940 accuracy. In this context, it has been revealed that the artificial neural networks method can be used in addition to the use of the heuristic method in the solution of ALB problems.
引用
收藏
页数:19
相关论文
共 54 条
[1]   THE RELATED ACTIVITY CONCEPT IN ASSEMBLY LINE BALANCING [J].
AGRAWAL, PK .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1985, 23 (02) :403-421
[2]   Balancing and scheduling tasks in assembly lines with sequence-dependent setup times [J].
Andres, Carlos ;
Miralles, Cristobal ;
Pastor, Rafael .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 187 (03) :1212-1223
[3]  
Arcus A.L., 1966, INT J PROD RES, V4, P259
[4]   A SURVEY OF EXACT ALGORITHMS FOR THE SIMPLE ASSEMBLY LINE BALANCING PROBLEM [J].
BAYBARS, I .
MANAGEMENT SCIENCE, 1986, 32 (08) :909-932
[5]   A survey on problems and methods in generalized assembly line balancing [J].
Becker, C ;
Scholl, A .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2006, 168 (03) :694-715
[6]  
Birbir Y., 2007, Int. J. of Systems Applications, Engineering & Development, V1, P21
[7]  
Birbir Y, 2008, ARTIF INT SER WSEAS, P194
[8]  
Blum C, 2006, LECT NOTES COMPUT SC, V4150, P96
[9]   ASSEMBLY-LINE BALANCING BY LINEAR-PROGRAMMING [J].
BOWMAN, EH .
OPERATIONS RESEARCH, 1960, 8 (03) :385-389
[10]  
Bryton B., 1954, BALANCING CONTINUOUS