Evaluation of sediment management strategies for Tarbela reservoir

被引:0
作者
Rashid M.U. [1 ]
Miqdad H. [2 ]
Saad Ul Hassan M. [3 ]
Haseeb A. [4 ]
Asad M. [5 ]
机构
[1] Department of Civil Engineering, University of Management and Technology, Lahore
[2] Ministry of Energy, Islamabad
[3] Ministry of Defence, Rawalpindi
[4] MM Pakistan Pvt LTD, Lahore
[5] Mechanical Engineering Department, Prince Mohammad Bin Fahd University, Al-Khobar
关键词
dams; barrages; reservoirs; floods; sedimentation; tunnels;
D O I
10.1680/jdare.22.00119
中图分类号
学科分类号
摘要
Globally, multipurpose large dams play significant roles by providing water for irrigation, flood control and hydropower. This study aims to evaluate different strategies for the evacuation of deposited sediments in Tarbela reservoir by using Hydrologic Engineering Center-River Analysis System. Sediment flushing from existing power tunnels was found infeasible due to the downstream constraints and the loss of hydropower. New sediment bypass tunnels on the right-side bank of the dam to overcome the constraints were analysed. The sediment balance ratio, long-term capacity ratio and economic analysis were computed along with sediment modelling for different scenarios. The most technically viable scenario was 90 days flushing at 390 m drawdown level with a discharge of 5000 m3/s. This scenario was not economically feasible in terms of net present value, internal rate of return and the benefit cost ratio. The upstream under construction Diamer Basha dam was also evaluated. The results suggested a large volume of sediment would be trapped in the upstream reservoir, which would ultimately lead to a significant reduction in the inflow of sediment and the delta movement in the Tarbela reservoir. This option was recommended due to its multiple benefits and potential capacity to enhance Tarbela reservoir's life. © 2023 Emerald Publishing Limited: All rights reserved.
引用
收藏
页码:106 / 115
页数:9
相关论文
共 29 条
[1]  
Basson G., The International Workshop on Erosion, Transport and Deposition of Sediments, Reservoir Sedimentation - An Overview of Global Sedimentation Rates, Sediment Yield and Sediment Deposition Prediction, 7, (2008)
[2]  
Faghihirad S., Lin B., Falconer R.A., Application of a 3D layer integrated numerical model of flow and sediment transport processes to a reservoir, Water, 7, 10, pp. 5239-5257, (2015)
[3]  
User Manual HEC-RAS (Hydraulic Engineering Centre-River Analysis System). Version 5.0, (2016)
[4]  
Dealing with Reservoir Sedimentation
[5]  
Bulletin Number 115, (1999)
[6]  
Jacobsen T., Sustainable reservoir development: The challenge of reservoir sedimentation, Hydropower into the Next Century-III, pp. 719-728, (1999)
[7]  
Kondolf G.M., Gao Y., Annandale G.W., Et al., Sustainable sediment management in reservoirs and regulated rivers: Experiences from five continents, Earth's Future, 2, 5, (2014)
[8]  
Mavima G.A., Soropa G., Makurira H., Dzvairo W., Sedimentation impacts on the reservoir as a result of land-use on a selected catchment in Zimbabwe, International Journal of Engineering Science and Technology, 3, 8, pp. 6599-6608, (2011)
[9]  
Meile T., Bretez N., Boilat J., Imboden B., Reservoir Sedimentation Management at Gebidem Dam, (2014)
[10]  
The Council Study: Study on the Sustainable Management and Development of the Mekong River, Including Impacts of Mainstream Hydropower Projects. BioRA Final Technical Report Series, Assessment of Planned Development Scenarios, Final Report, 4, (2017)