Comparative Analysis on Influencing Factors of Alignment Monitoring between Continuous Rigid-frame Bridge and Continuous Girder Bridge

被引:0
|
作者
Wang C. [1 ]
机构
[1] School of Civil Engineering, Yantai University, Yantai
来源
Instrumentation Mesure Metrologie | 2019年 / 18卷 / 04期
关键词
Construction sequences; Continuous girder (CG) bridge; Continuous rigid-frame (CRF) bridge; Cumulative displacement;
D O I
10.18280/i2m.180412
中图分类号
学科分类号
摘要
In this paper, finite-element models are created for a continuous rigid-frame (CRF) system and a continuous girder (CG) system with the same superstructure. Next, two indices were selected to measure the difficulty of alignment monitoring, namely, the cumulative displacement in cantilevering and the difference between the two sides of the closure gap (the cross-gap difference) in cumulative displacement. After that, the two models were utilized to analyze how design parameters, pre-tensioning sequence and closure sequence affect the alignment monitoring difficulty of the two types of bridges. The analysis shows that the CRF bridge was less affected by prestress force and closure sequence than the CG bridge. This means the pre-tensioning sequence has greater impacts on the cumulative displacement of the CRF bridge than the CG bridge. The reasons for the impacts were further analyzed, and the closure sequence was rationalized. The research findings shed important new light on the alignment monitoring of CRF bridges. © 2019 Lavoisier. All rights reserved.
引用
收藏
页码:421 / 425
页数:4
相关论文
共 50 条
  • [31] Estimation formula of finished bridge pre-camber in continuous rigid-frame bridges
    Sisi Yao
    Biao Peng
    Luyao Wang
    Hengda Chen
    Scientific Reports, 12
  • [32] Analysis of Mechanical Behaviors of a Single Pylon Cable-Stayed and Continuous Rigid-Frame Composite Bridge
    Feng, Dongming
    Li, Aiqun
    Li, Jianhui
    Yang, Guang
    ADVANCES IN STRUCTURES, PTS 1-5, 2011, 163-167 : 2219 - 2223
  • [33] Effect of Jacking Force on Combined Steel Truss and Concrete Continuous Rigid-Frame Bridge
    钢桁-混凝土连续刚构协作体系桥梁顶推效应研究
    1600, Wuhan Bridge Research Institute (50): : 14 - 19
  • [34] Analysis on dynamic characteristics for a high strength light-weight concrete continuous rigid-frame bridge
    Liu, Mu-Yu
    Zhang, Li-Hua
    STRUCTURAL CONDITION ASSESSMENT, MONITORING AND IMPROVEMENT, VOLS 1 AND 2, 2007, : 371 - 375
  • [35] Seismic analysis of multi-span continuous reinforced concrete rigid-frame arch-bridge
    Li, Fa-Xiong
    Nie, Jian-Guo
    Fan, Jian-Sheng
    Gongcheng Lixue/Engineering Mechanics, 2010, 27 (12): : 179 - 185
  • [36] PUSHOVER ANALYSIS OF A PRESTRESSED CONCRETE CONTINUOUS RIGID-FRAME BRIDGE WITH BOX-TYPE HIGH PIERS
    Xia, Zhang-Hua
    Zheng, Mao-Jin
    Zong, Zhou-Hong
    Deng, Jiang-Dong
    PROCEEDINGS OF THE ELEVENTH INTERNATIONAL SYMPOSIUM ON STRUCTURAL ENGINEERING, VOL I AND II, 2010, : 1561 - 1568
  • [37] Research on Mechanical Property of Asymmetric Composite Girder Bridge of Combined Rigid Frame and Continuous Girder System
    Yang X.
    Liu Q.
    Zhu Y.
    Bridge Construction, 2023, 53 : 46 - 53
  • [38] Construction control of rigid frame-continuous girder bridge based on grey theory
    Wan, Lijun
    Qiao, Jiaqi
    Sun, Quansheng
    Liu, Jingyang
    Journal of Engineering and Applied Science, 2024, 71 (01):
  • [39] Research on Mechanical Performance of In-Service Continuous Rigid-Frame Bridge Based on Vehicle-Bridge Coupling Vibration
    Liu, Yixiang
    Wang, Lingbo
    Jiang, Cong
    Shu, Hao
    APPLIED SCIENCES-BASEL, 2024, 14 (16):
  • [40] Analysis on the Long-Term Deflection in Prestressed Concrete Continuous Rigid Frame Box Girder Bridge
    Li, Hongjiang
    CICTP 2019: TRANSPORTATION IN CHINA-CONNECTING THE WORLD, 2019, : 192 - 201