共 20 条
[1]
Weisner T. S., Attachment as a cultural and ecological problem with pluralistic solutions, Human Development, 48, 1, pp. 89-94, (2005)
[2]
Odeh A. M., Battaineh H. T., Causes of construction delay: traditional contracts, International journal of project management, 20, 1, pp. 67-73, (2002)
[3]
George M., Loosemore M., Site operatives' attitudes towards traditional masculinity ideology in the Australian construction industry, Construction management and economics, 37, 8, pp. 419-432, (2019)
[4]
Wang H., Zhang Y., Gao W., Kuroki S., Life cycle environmental and cost performance of prefabricated buildings, Sustainability, 12, 7, (2020)
[5]
Wang Z.-L., Shen H.-C., Zuo J., Risks in prefabricated buildings in China: Importance-performance analysis approach, Sustainability, 11, 12, (2019)
[6]
Murray N., Fernando T., Aouad G., A virtual environment for the design and simulated construction of prefabricated buildings, Virtual Reality, 6, pp. 244-256, (2003)
[7]
Retik A., Warszawski A., Automated design of prefabricated building, Building and Environment, 29, 4, pp. 421-436, (1994)
[8]
Margerum R. D., Robinson C. J., The challenges of collaboration in environmental governance: barriers and responses, (2016)
[9]
Tsamboulas D. A., Kapros S., Decision-making process in intermodal transportation, Transportation Research Record, 1707, 1, pp. 86-93, (2000)
[10]
Hao W., Wang J., Fan S., Hao W., Evaluation and analysis method for natural gas hydrate storage and transportation processes, Energy conversion and management, 49, 10, pp. 2546-2553, (2008)