Prediction model of measurement errors in current transformers based on deep learning

被引:11
作者
Li, Zhen-hua [1 ,2 ]
Cui, Jiu-xi [1 ]
Lu, He-ping [3 ]
Zhou, Feng [3 ]
Diao, Ying-long [3 ]
Li, Zhen-xing [1 ]
机构
[1] China Three Gorges Univ, Coll Elect Engn & New Energy, Yichang 443002, Peoples R China
[2] China Three Gorges Univ, Prov Engn Res Ctr Intelligent Energy Technol, Yichang 443002, Peoples R China
[3] China Elect Power Res Inst, Wuhan 430074, Peoples R China
基金
国家重点研发计划;
关键词
ELECTRONIC VOLTAGE TRANSFORMERS; SYSTEM;
D O I
10.1063/5.0190206
中图分类号
TH7 [仪器、仪表];
学科分类号
0804 ; 080401 ; 081102 ;
摘要
The long-term monitoring stability of electronic current transformers is crucial for accurately obtaining the current signal of the power grid. However, it is difficult to accurately distinguish between the fluctuation of non-stationary random signals on the primary side of the power grid and the gradual error of the transformers themselves. A current transformer error prediction model, CNN-MHA-BiLSTM, based on the golden jackal optimization (GJO) algorithm, which is used to obtain the optimal parameter values, bidirectional long short-term memory (BiLSTM) network, convolutional neural networks (CNNs), and multi-head attention (MHA), is proposed to address the difficulty of measuring error evaluation. This model can be used to determine the operation of transformers and can be widely applied to assist in determining the stability of transformer operation and early faults. First, CNN is used to mine the vertical detail features of error data at a certain moment, improving the speed of error prediction. Furthermore, a cascaded network with BiLSTM as the core is constructed to extract the horizontal historical features of the error data. The GJO algorithm is used to adjust the parameters of the BiLSTM model; optimize the hidden layer nodes, training frequency, and learning rate; and integrate MHA mechanism to promote the model to pay attention to the characteristic changes of the data in order to improve the accuracy of error prediction. Finally, this method is applied to the operation data of transformer in substations, and four time periods of data are selected to verify the model effectiveness of the current transformer dataset. The analysis results of single step and multi-step examples indicate that the proposed model has significant advantages in terms of accuracy and stability in error prediction.
引用
收藏
页数:16
相关论文
共 29 条
[1]   A Simple Method for the Calibration of Traditional and Electronic Measurement Current and Voltage Transformers [J].
Brandolini, Arnaldo ;
Faifer, Marco ;
Ottoboni, Roberto .
IEEE TRANSACTIONS ON INSTRUMENTATION AND MEASUREMENT, 2009, 58 (05) :1345-1353
[2]   Optical microscope algorithm: A new metaheuristic inspired by microscope magnification for solving engineering optimization problems [J].
Cheng, Min-Yuan ;
Sholeh, Moh Nur .
KNOWLEDGE-BASED SYSTEMS, 2023, 279
[3]  
Chongqing K., 2004, Power Syst. Autom, V17, P1
[4]   Golden jackal optimization: A novel nature-inspired optimizer for engineering applications [J].
Chopra, Nitish ;
Ansari, Muhammad Mohsin .
EXPERT SYSTEMS WITH APPLICATIONS, 2022, 198
[5]  
Chu D., 1999, Proceedings: Electrical Insulation Conference and Electrical Manufacturing and Coil Winding Conference (Cat. No.99CH37035), P669, DOI 10.1109/EEIC.1999.826290
[6]   Current transformer model [J].
das Chagas Fernandes Guerra, Francisco ;
Mota, Wellington Santos .
IEEE TRANSACTIONS ON POWER DELIVERY, 2007, 22 (01) :187-194
[7]  
Dey R, 2017, MIDWEST SYMP CIRCUIT, P1597, DOI 10.1109/MWSCAS.2017.8053243
[8]  
General Metrological Terms and Definitions, 2011, JJF 1001-2011
[9]  
Graves A, 2012, STUD COMPUT INTELL, V385, P1, DOI [10.1162/neco.1997.9.1.1, 10.1007/978-3-642-24797-2]
[10]   Great Wall Construction Algorithm: A novel meta-heuristic algorithm for engineer problems [J].
Guan, Ziyu ;
Ren, Changjiang ;
Niu, Jingtai ;
Wang, Peixi ;
Shang, Yizi .
EXPERT SYSTEMS WITH APPLICATIONS, 2023, 233