Safety assessment of the construction of double track tunnels underneah exsiting railway tunnels

被引:0
|
作者
Guo, Fengfeng [1 ]
Chen, Yupeng [2 ]
Zhang, Yongjie [1 ]
Feng, Qi [3 ]
Cui, Da [4 ]
机构
[1] Tunnel Engn Co Ltd CCCC, Beijing, Peoples R China
[2] Power China Railway Construct Investment GroupCo, Beijing, Peoples R China
[3] China Univ Petr, Coll Pipeline & Civil Engn, Qingdao, Peoples R China
[4] CCCC First Highway Engn Grp Co LTD, Engn Co LTD 7, Zhengzhou, Peoples R China
关键词
double-line tunnel; underpass construction; stratum settlement; repetitive disturbance; numerical simulation; TWIN TUNNELS; SHALLOW;
D O I
10.24425/ace.2024.148917
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The ground disturbance caused by the tunnel construction will inevitably have an impact on the upper part of the constructed tunnel structure, and the railroad tunnel requires a very high level of control over the structural settlement deformation. For the problem of double-hole tunnel under the built tunnel, this paper takes Chongqing Mingyue Mountain Tunnel under the built Shanghai-Rong Railway Paihua Cave tunnel and Zheng-Yu Railway tunnel as the engineering background, and starts from the mechanism of ground loss caused by tunnel excavation, firstly, the settlement at the height of the existing tunnel strata is obtained through theoretical analysis, and the new Mingyue Mountain Tunnel under the Shanghai-Rong Railway tunnel is determined to be a more dangerous section. Further simulate and calculate the dynamic excavation process of the new double-hole tunnel underpass, and study the settlement deformation law of the Mingyue Mountain Tunnel underpassing the Hurong Railway Tunnel. According to the requirements of railroad tunnel for settlement deformation control, the new tunnel is determined to be constructed by step method to ensure the safety of railroad tunnel. The shortcomings of the theoretical calculation are analyzed to illustrate the important role of numerical simulation in the evaluation of tunnel underpass projects.
引用
收藏
页码:375 / 387
页数:13
相关论文
共 50 条
  • [41] The research on the construction mechanics for building double-tube parallel tunnels
    Zeng, XQ
    COMPUTER METHODS AND ADVANCES IN GEOMECHANICS, VOL 2, 1997, : 1349 - 1352
  • [42] Reducing inconsistencies of FAHP in structural safety assessment of diversion tunnels
    Liu, Kang
    Chen, Yongcan
    Wang, Haoran
    Xie, Hui
    Liu, Zhaowei
    APPLIED SOFT COMPUTING, 2023, 146
  • [43] Existing standardization on monitoring, safety assessment and maintenance of bridges and tunnels
    Allaix, Diego Lorenzo
    Bigaj-van Vliet, Agnieszka
    EUROPEAN ASSOCIATION ON QUALITY CONTROL OF BRIDGES AND STRUCTURES, EUROSTRUCT 2023, VOL 6, ISS 5, 2023, : 498 - 504
  • [44] Assessment on safety of lattice girder reinforced shotcrete support for tunnels
    Li, Hongquan
    Yang, Chengyong
    Xu, Mingxin
    Lu, Jinghui
    Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2009, 28 (SUPPL. 2): : 3903 - 3908
  • [45] The mechanism behind seismic damage to railway mountain tunnels and assessment of their aseismic performance
    Kojima, Y.
    Yashiro, K.
    Funahashi, T.
    Miyabayashi, H.
    Iura, T.
    Asakura, T.
    HARMONISING ROCK ENGINEERING AND THE ENVIRONMENT, 2012, : 1217 - 1220
  • [46] Comprehensive evaluation of the green construction level of railway tunnels in the Qinghai-Tibet Plateau
    Li, Haiwen
    Bao, Xueying
    Journal of Railway Science and Engineering, 2021, 18 (02) : 524 - 532
  • [47] Construction difficulties and countermeasures for the Lanzhou-Chongqing railway tunnels in complicated geological conditions
    Li, Guoliang
    Modern Tunnelling Technology, 2015, 52 (05) : 10 - 15
  • [48] Olmata Tunnel, from survey to construction: an integrated design approach for the renewal of railway tunnels
    Foria, Federico
    Pacilli, Alessandro
    Collura, Salvatore
    Giordano, Riccardo
    Miceli, Gabriele
    GALLERIE E GRANDI OPERE SOTTERRANEE, 2019, (131): : 31 - 45
  • [49] SAFETY ANALYSIS ON THE BRIDGE TRAVERSED BY METRO DOUBLE-LINE TUNNELS
    Lv Gaofeng
    Ni Yongjun
    Wei Qingchao
    He Haijian
    INNOVATION & SUSTAINABILITY OF MODERN RAILWAY PROCEEDINGS OF ISMR' 2008, 2008, : 183 - 189
  • [50] High speed railway line bologna-florence permanent-way construction in the long railway tunnels
    Greco, Maurizio
    Foresta, Mario
    Ingegneria Ferroviaria, 2010, 65 (10): : 863 - 880