An Extension Approach of Building Information Modeling to Cyber-Physical Systems

被引:0
作者
Yang Q. [1 ,2 ]
Ma Z. [2 ]
Xing J. [1 ]
Yuan S. [3 ]
机构
[1] College of Defense Engineering, PLA Army Engineering University, Nanjing
[2] School of Civil Engineering, Tsinghua University, Beijing
[3] Research Institute of PLA Army, Wuxi
来源
Tongji Daxue Xuebao/Journal of Tongji University | 2020年 / 48卷 / 10期
关键词
Building information modeling(BIM); Cyber-physical systems; Extension of entities;
D O I
10.11908/j.issn.0253-374x.20069
中图分类号
学科分类号
摘要
This paper proposes a novel extension approach of BIM to cyber-physical systems(CPS). It explores the general framework for extending BIM orienting to CPS, defines and constructs the cyber-physical building information modeling(BIM) entities. This paper can provide efficient and effective support for constructing new kinds of systems such as BIM-based dynamic control and management systems for operating and maintaining civil engineering, and human-machine interacting systems based on augment reality. The experimental results of the BIM based prototype systems show that the proposed approach has the advantages of high modularity, easy understanding, less programming codes, and high development efficiency. © 2020, Editorial Department of Journal of Tongji University. All right reserved.
引用
收藏
页码:1406 / 1416
页数:10
相关论文
共 22 条
  • [11] RUPPEL U, SCHATZ K., Designing a BIM-based serious game for fire safety evacuation simulations, Advanced Engineering Informatics, 25, (2011)
  • [12] LI M, YU H, LIU P., An automated safety risk recognition mechanism for underground construction at the pre-construction stage based on BIM, Automation in Construction, 91, (2018)
  • [13] GAO X, PISHDAD-BOZORGI P., BIM-enabled facilities operation and maintenance: a review, Advanced Engineering Informatics, 39, (2019)
  • [14] CHENG J, CHEN W, CHEN K, Et al., Data-driven predictive maintenance planning framework for MEP components based on BIM and IoT using machine learning algorithms, Automation in Construction, 112, (2020)
  • [15] VANLANDE R, NICOLLE C, CRUZ C., IFC and building lifecycle management, Automation in Construction, 18, (2008)
  • [16] OTI A H, TIZANI W., BIM extension for the sustainability appraisal of conceptual steel design, Advanced Engineering Informatics, 29, (2015)
  • [17] CHEN Lichun, LAI Huahui, DENG Xueyuan, Et al., Study on the method of expanding entities of domain layer of IFC standard, Journal of Graphics, 36, 2, (2015)
  • [18] GETULI V, CAPONE P, BRUTTINI A, Et al., BIM-based immersive virtual reality for construction workspace planning: a safety-oriented approach, Automation in Construction, (2020)
  • [19] CHEN K, LU W S, PENG Y, Et al., Bridging BIM and building: from a literature review to an integrated conceptual framework, International Journal of Project Management, 33, (2015)
  • [20] AKANMU A, ANUMBA C., Cyber-physical systems integration of building information models and the physical construction, engineering, Construction and Architectural Management, 22, 5, (2015)