共 5 条
[1]
Chen M.-C., Hsu C.-L., Wu H.-S., Develop the healthcare logistics service with Kano model, Journal of Quality, 26, 1, pp. 1-22, (2019)
[2]
Kulak O., Kahraman C., Multi-attribute comparison of advanced manufacturing systems using fuzzy vs. crisp axiomatic design approach, International Journal of Production Economics, 95, 3, pp. 415-424, (2005)
[3]
Opricovic S., Tzeng G.-H., Compromise solution by MCDM methods: A comparative analysis of VIKOR and TOPSIS, European Journal of Operational Research, 156, 2, pp. 445-455, (2004)
[4]
Saaty T.L., The Analytic Hierarchy Process: Planning, Priority Setting, Resource Allocation, (1980)
[5]
Shankar V., Urban G.L., Sultan F., Online trust: A stakeholder perspective, concepts, implications, and future directions, The Journal of Strategic Information Systems, 11, 3-4, pp. 325-344, (2002)