Design and Verification of Continuous Moulding Process of Ultra-long Thin-walled Deployable Boom

被引:0
作者
Zhang T. [1 ]
Cong Q. [1 ]
Chen W. [2 ]
Liu H. [2 ]
机构
[1] Beijing Institute of Spacecraft System Engineering, Beijing
[2] Beijing Satellite Manufacturing Co., Ltd, Beijing
来源
Jixie Gongcheng Xuebao/Journal of Mechanical Engineering | 2023年 / 59卷 / 17期
关键词
continuous adhesion; continuous curing; moulding process; ultra-long thin-walled deployable boom;
D O I
10.3901/JME.2023.17.126
中图分类号
学科分类号
摘要
Ultra-long Thin-walled deployable composite boom with high strain ability are of considerable interest used in the main support component of hundred-meter-size deployable spacecraft structures due to their light weight and high folding-storage ratio function. This research seeks to investigate continuous curing technology of an ultra-long thin-walled deployable composite boom made of high strain carbon-fibre-reinforced-plastics. The equipment and process for continuous curing of semi-thin-walled boom and continuous adhesion of thin-walled boom are designed. The effect of the length of the translational traction zone from unfolding to reeling on the stress level during continuous forming process is simulated by finite element model for determining the minimum length of the transition zone of the equipment. The test run of the continuous molding equipment for thin-walled boom is conducted according to the formulated pressure and pulsation time parameters in the curing process. The design rationality of the moulding equipment and process is verified by the trial-manufacture of 17 m ultra-long thin-walled deployable boom sample. © 2023 Editorial Office of Chinese Journal of Mechanical Engineering. All rights reserved.
引用
收藏
页码:126 / 135
页数:9
相关论文
共 20 条
[1]  
LI Bingyan, LIU Rongqiang, CONG Qiang, Et al., Design and optimization of a tri-prism deployable membrane support arm using lenticular collapsible composite tubes[J], Journal of Mechanical Engineering, 56, 7, pp. 35-43, (2020)
[2]  
BLOCK J, STRAUBEL M, WIEDEMANN M., Ultralight deployable booms for solar sails and other large gossamer structures in space[J], Acta Astronautica, 68, 7, pp. 984-992, (2010)
[3]  
KASAI T, ASARI K., Continuous forming method and device for H-shaped FRP member
[4]  
KASAI T, OKAMOTO M, KURIYAMA S., Method and apparatus for continuous molding of fiber reinforced plastic member with curvature
[5]  
JU Bowen, QI Junwei, LI Tao, Et al., Research on molding pressure of advanced pultrusion for half lenticular tube[J], Journal of Aeronautical Materials, 35, 5, pp. 20-26, (2015)
[6]  
XIAO Jian, QI Junwei, XIAO Jun, Et al., Research on advanced pultrusion equipment technology of half lenticular tube[J], Fiber Reinforced Plastics/Composites, 11, pp. 42-47, (2014)
[7]  
YANG Xingrui, Research on Moving Mold advanced pultrusion technology of composite half lenticular tube, (2014)
[8]  
ZHOU Huanghe, QI Junwei, CHU Jing, Et al., Study on the pretreatment process of advanced pultrusion for half lenticular tube[J], Fiber Reinforced Plastics/Composites, 8, pp. 66-70, (2015)
[9]  
YANG Xingrui, XIAO Jian, QI Junwei, Et al., Research of a new method about the half composite lenticular tube advanced pultrusion, Fiber Reinforced Plastics/ Composites, 6, pp. 62-65, (2014)
[10]  
JU Bowen, Research on the optimization design and key technologies of advanced pultrusion system for half lenticular tube, (2014)