Impact of operations and maintenance on the energy production of floating offshore wind farms across the North Sea and the Iberian Peninsula

被引:8
作者
Centeno-Telleria, Manu [1 ]
Yue, Hong [2 ]
Carrol, James [2 ]
Penalba, Markel [3 ,4 ]
Aizpurua, Jose I. [1 ,4 ]
机构
[1] Mondragon Univ, Elect & Comp Sci Dept, Goiru 2, Arrasate Mondragon 20500, Spain
[2] Univ Strathclyde, Elect & Elect Engn Dept, Glasgow G1, Scotland
[3] Mondragon Univ, Fluid Mech Dept, Loramendi 4, Arrasate Mondragon 20500, Spain
[4] Basque Fdn Sci, Ikerbasque, Euskadi Plaza 5, Bilbao, Spain
关键词
Floating offshore wind; O&M; Energy production; Site-identification; North Sea; Iberian Peninsula; SENSITIVITY-ANALYSIS; COST;
D O I
10.1016/j.renene.2024.120217
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
This paper evaluates how operation and maintenance (O&M) factors affect energy production and optimal deployment sites for floating offshore wind farms (FOWs) in the North Sea and the Iberian Peninsula. The geospatial analysis incorporates reliability, maintainability, accessibility, and availability aspects, and evaluates their impact on energy production. The results demonstrate that O&M factors have a significant impact on the final energy production and therefore on the identification of optimal deployment sites, both quantitatively and qualitatively. In the North Sea, promising deployment sites are identified in regions with lower wind resources but shorter turbine downtime, such as Denmark, Germany and southern Scotland. In the Iberian Peninsula, areas with high resource potential, such as the northwest Spanish and Portuguese coasts, may be less appealing than the less powerful Mediterranean regions due to lower maintainability. In particular, the efficiency of future FOW farms in the North Sea and Atlantic Ocean regions of the Iberian Peninsula heavily relies on vessel operational limits for major repairs. Increasing the significant wave height limit for major repairs from 1.5 m to 2 m results in an average capacity factor increment of 2.54% across ScotWind farms and over 6% along the northwest coast of the Iberian Peninsula.
引用
收藏
页数:13
相关论文
共 29 条
[1]  
Akbari N., 2017, Renew Energy
[2]  
[Anonymous], 2022, Sustain. Energy Rev.
[3]  
[Anonymous], 2023, International Energy AgencyEnergy Technology Perspectives
[4]  
Barter G.E., 2020, Renew Energy Focus
[5]  
Bento N., 2019, Sustain. Energy Rev.
[6]  
Castro-Santos L., 2016, ENERGY
[7]  
Castro-Santos L., 2020, Economic feasibility of floating offshore wind farms in PortugalOcean Eng
[8]  
Castro-Santos L., 2015, Manage
[9]  
Castro-Santos L., 2016, RENEW ENERG
[10]  
Castro-Santos L., 2020, Policy