An improved memetic algorithm for multi-objective resource-constrained flexible job shop inverse scheduling problem: An application for machining workshop

被引:7
|
作者
Wei, Shupeng [1 ,2 ]
Tang, Hongtao [1 ,2 ]
Li, Xixing [3 ]
Lei, Deming [4 ]
Wang, Xi Vincent [5 ]
机构
[1] Wuhan Univ Technol, Sch Mech & Elect Engn, Wuhan 430070, Peoples R China
[2] Hubei Prov Engn Res Ctr Robot & Intelligent Mfg, Wuhan, Peoples R China
[3] Hubei Univ Technol, Sch Mech Engn, Wuhan, Peoples R China
[4] Wuhan Univ Technol, Sch Automat, Wuhan, Peoples R China
[5] KTH Royal Inst Technol, Dept Prod Engn, Stockholm, Sweden
基金
中国国家自然科学基金;
关键词
Resource constrained flexible job shop; scheduling; Inverse scheduling; Multi -objective optimization; Memetic algorithm; GENETIC ALGORITHM; OPTIMIZATION ALGORITHM; SEARCH; TIME;
D O I
10.1016/j.jmsy.2024.03.005
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Resource -constrained flexible job shop scheduling problems are commonly encountered in some manufacturing industries, and have been widely studied in recent years. However, traditional resource constrained flexible job shop scheduling problem rarely consider the uncertainties in actual manufacturing systems, which may make the original schedule become suboptimal or even unfeasible. Therefore, a resource constrained flexible job shop inverse scheduling problem (RCFJISP) is proposed in this paper, which aims to cope with uncertain events by simultaneously adjusting the machine, worker and process parameters of the original schedule. A multi -objective optimization model is constructed to minimize the makespan, worker cost, machine energy consumption and deviation index. Furthermore, an improved memetic algorithm (IMA) is developed for solving the proposed problem. In IMA, a novel double -layer encoding mechanism is designed to enhance the capacity in exploring new solution's domains. Three initialization strategies utilizing original scheduling information are designed to improve the quality of initial solutions. An adaptive mutation strategy and a local search mechanism are designed to enhance exploration and exploitation ability of the algorithm. And a crowding operator is proposed to reflect the diversity of the population effectively. In computational experiments, 28 extended benchmarks are constructed, and the effectiveness of the proposed strategy and algorithm is verified by comparing IMA with its 4 variants and other 4 widely used algorithms. Finally, two inverse scheduling problems of a real -world hydraulic cylinder machining workshop under two uncertain situations are studied. The results demonstrate that IMA can effectively solve the actual inverse scheduling problem. With a slight adjustment to the original scheduling, it can reduce the makespan by 11.5%, the worker cost by 8.1% and the machine energy consumption by 27.9% on average.
引用
收藏
页码:264 / 290
页数:27
相关论文
共 50 条
  • [31] An improved multi-objective optimization algorithm for solving flexible job shop scheduling problem with variable batches
    Wu Xiuli
    Peng Junjian
    Xie Zirun
    Zhao Ning
    Wu Shaomin
    JOURNAL OF SYSTEMS ENGINEERING AND ELECTRONICS, 2021, 32 (02) : 272 - 285
  • [32] Multi-objective flexible job shop scheduling problem using variable neighborhood evolutionary algorithm
    Wang, Chun
    Ji, Zhicheng
    Wang, Yan
    MODERN PHYSICS LETTERS B, 2017, 31 (19-21):
  • [33] Multi-Objective Memetic Search Algorithm for Multi-Objective Permutation Flow Shop Scheduling Problem
    Li, Xiangtao
    Ma, Shijing
    IEEE ACCESS, 2016, 4 : 2154 - 2165
  • [34] A multi-objective mathematical model and evolutionary algorithm for the dual-resource flexible job-shop scheduling problem with sequencing flexibility
    Vital-Soto, Alejandro
    Baki, Mohammed Fazle
    Azab, Ahmed
    FLEXIBLE SERVICES AND MANUFACTURING JOURNAL, 2023, 35 (03) : 626 - 668
  • [35] A hybrid discrete firefly algorithm for multi-objective flexible job shop scheduling problem with limited resource constraints
    Karthikeyan, S.
    Asokan, P.
    Nickolas, S.
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2014, 72 (9-12) : 1567 - 1579
  • [36] An estimation of distribution algorithm for the multi-objective flexible job-shop scheduling problem
    Wang, Shengyao
    Wang, Ling
    Liu, Min
    Xu, Ye
    PROCEEDINGS OF THE 2013 IEEE SYMPOSIUM ON COMPUTATIONAL INTELLIGENCE IN SCHEDULING (CISCHED), 2013, : 1 - 8
  • [37] Multi-objective flexible job shop scheduling problem using differential evolution algorithm
    Cao, Yang
    Shi, Haibo
    Han, Zhonghua
    2017 9TH INTERNATIONAL CONFERENCE ON MODELLING, IDENTIFICATION AND CONTROL (ICMIC 2017), 2017, : 521 - 526
  • [38] Developing two multi-objective evolutionary algorithms for the multi-objective flexible job shop scheduling problem
    Rahmati, Seyed Habib A.
    Zandieh, M.
    Yazdani, M.
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2013, 64 (5-8) : 915 - 932
  • [39] Multi-objective optimization for energy-efficient flexible job shop scheduling problem with transportation constraints
    Dai Min
    Tang Dunbing
    Adriana, Giret
    Salido Miguel, A.
    ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING, 2019, 59 : 143 - 157
  • [40] Solving the Flexible Job Shop Scheduling Problem Based on Memetic Algorithm
    Zhang, Guohui
    ADVANCES IN PRODUCT DEVELOPMENT AND RELIABILITY III, 2012, 544 : 1 - 5