Cyclic behaviour of precast beam-column connections with shear key and hybrid rebar coupler: An experimental study

被引:1
作者
Moka, Vijay Tarun Kumar [1 ,2 ]
Chidambaram, R. Siva [1 ,2 ]
机构
[1] Acad Sci & Innovat Res AcSIR, Ghaziabad 201002, India
[2] CSIR Cent Bldg Res Inst, ACSC Grp, Roorkee 247667, India
关键词
Precast structures; Beam -column connections; shear key; HPFRCC; Rebar Coupler; Interface treatment; Hysteresis behaviour; REINFORCED-CONCRETE BEAMS; SEISMIC PERFORMANCE; EARTHQUAKE; DAMAGE; RC;
D O I
10.1016/j.istruc.2024.106084
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The current work attempts to examine the cyclic behaviour of the proposed shear key based precast beamcolumn wet connections. The configurations consist of shear keys, fiber reinforced composites and interface treatment between beam & column. The rebar continuity between the precast beam and column was established using hybrid rebar couplers. Six precast specimens and one monolithic joint were cast and tested under reversed cyclic loading. The seismic performance of the connections was assessed and discussed in terms of hysteretic behaviour, stiffness and strength degradation, damage tolerance, displacement ductility, energy dissipation characteristics, and joint principal tensile stresses. The strength enhancement, dissipated energy, stiffness retention of precast specimens was similar to monolithic specimen. The crack patterns revealed the influence of stiffness of coupler in the plastic hinge region with shifting of cracks next to coupler and joint region. Also, the presence of fiber reinforced composites, shear key and interface treatment in the connection region exhibited controlled cracking in the plastic hinge region and restricted the joint shear failure. The obtained results were validated through ACI 374.1-05 requirements criteria, which shows the acceptable seismic behaviour. The findings obtained from this study demonstrated the integrity of proposed beam -column connections against seismic forces and could achieve emulative design philosophy.
引用
收藏
页数:17
相关论文
共 42 条
  • [11] Ductile connections in precast concrete moment resisting frames
    Ertas, O
    Ozden, S
    Ozturan, T
    [J]. PCI JOURNAL, 2006, 51 (03): : 66 - +
  • [12] Experimental study of prefabricated RC column-foundation assemblies with two different connection methods and using large-diameter reinforcing bars
    Fan, Jia-Jun
    Feng, De-Cheng
    Wu, Gang
    Hou, Shitong
    Lu, Yong
    [J]. ENGINEERING STRUCTURES, 2020, 205
  • [13] Experimental Cyclic Behavior of Precast Hybrid Beam-Column Connections with Welded Components
    Girgin, Sadik Can
    Misir, Ibrahim Serkan
    Kahraman, Serap
    [J]. INTERNATIONAL JOURNAL OF CONCRETE STRUCTURES AND MATERIALS, 2017, 11 (02) : 229 - 245
  • [14] Seismic performance of a novel precast concrete beam-column connection using low-shrinkage engineered cementitious composites
    Gou, Shuangke
    Ding, Ran
    Fan, Jiansheng
    Nie, Xin
    Zhang, Jun
    [J]. CONSTRUCTION AND BUILDING MATERIALS, 2018, 192 : 643 - 656
  • [15] Shear Capacity of Precast Concrete Shear Keys with Ultrahigh-Performance Concrete for Connections
    Hu, Menghan
    Han, Qiang
    Wu, Suiwen
    Du, Xiuli
    [J]. JOURNAL OF BRIDGE ENGINEERING, 2021, 26 (07)
  • [16] Experimental study on the seismic performance of new precast concrete beam-column joints with replaceable connection
    Huang, Wei
    Hu, Gaoxing
    Zhang, Jiarui
    [J]. STRUCTURES, 2022, 35 : 856 - 872
  • [17] Experimental study and numerical simulation of precast segmental bridge columns with semi-rigid connections
    Hung, Hsiao-Hui
    Sung, Yu -Chi
    Lin, Kuan-Chen
    Jiang, Chi-Rung
    Chang, Kuo-Chun
    [J]. ENGINEERING STRUCTURES, 2017, 136 : 12 - 25
  • [18] Ibrahim IS, 2014, Malays J Civ Eng, V26, P14
  • [19] Jain SK, 2006, Indian Concr J
  • [20] Cyclic Evaluation of Severely Damaged RC Frames Repaired and Strengthened through FRP-Wrapped Coupler-Box Confinement
    Kothapalli, Naveen Kumar
    Chidambaram, R. Siva
    Agarwal, Pankaj
    [J]. JOURNAL OF COMPOSITES FOR CONSTRUCTION, 2022, 26 (03)