Improved TBM side cutter life prediction method considering rock integrity and TBM tunnelling attitude

被引:0
|
作者
Guo, Qian [1 ]
Wang, Ruirui [2 ]
Xiao, Yuhang [3 ]
机构
[1] Univ Jinan, Sch Water Conservancy & Environm, Jinan, Peoples R China
[2] Shandong Jianzhu Univ, Sch Civil Engn, Jinan, Peoples R China
[3] China Construct Infrastruct Corp Ltd, Beijing, Peoples R China
关键词
Tunnel boring machine; Cutter life; Rock integrity; Tunnelling attitude; PERFORMANCE PREDICTION; DISC CUTTER; WEAR; MODEL;
D O I
10.1007/s12206-024-0508-z
中图分类号
TH [机械、仪表工业];
学科分类号
0802 ;
摘要
Cutter life is an important economical index for TBM excavation, and its prediction is widely concerned. In our past researches, a TBM cutter life prediction method is proposed. According to the data collected by the 6th section of the Qingdao metro project, it is found that our past method is suitable for predicting the normal cutter life, but the predicting effect of the side cutter life needs to be improved. The key of our past method is to calculate the consumption coefficient of the tunneling area, which means the consumption of cutter life by tunneling through unit length and is a function of uniaxial compressive strength (UCS) and Vicker's hardness number of rock (VHNR). In this paper, the consumption coefficient is modified to be more suitable for side cutters, by involving two new key influencing factors, joint frequency (Jf) and TBM tunnelling attitude (alpha), into the regression. The modified consumption rate is calculated according to 94 samples collected from test area I, with the total length of 895m. The proposed method is verified by 98 samples collected from another test area with more complexed and different test area, with the total length of 822 m. The prediction results of the proposed method have high consistence with the actual value. Compared with our past method, the side cutter life prediction accuracy of the proposed method is higher, which is only 22.4 %. The results proved the proposed method is effective for predicting the side cutter life.
引用
收藏
页码:2873 / 2883
页数:11
相关论文
共 50 条
  • [41] Investigation of the Rock Fragmentation Process by a Single TBM Cutter Using a Voronoi Element-Based Numerical Manifold Method
    Quansheng Liu
    Yalong Jiang
    Zhijun Wu
    Xiangyu Xu
    Qi Liu
    Rock Mechanics and Rock Engineering, 2018, 51 : 1137 - 1152
  • [42] Investigation of the Rock Fragmentation Process by a Single TBM Cutter Using a Voronoi Element-Based Numerical Manifold Method
    Liu, Quansheng
    Jiang, Yalong
    Wu, Zhijun
    Xu, Xiangyu
    Liu, Qi
    ROCK MECHANICS AND ROCK ENGINEERING, 2018, 51 (04) : 1137 - 1152
  • [43] Microwave assistance effect for rock breaking of TBM disc cutter using the coupled method of continuum and grain-based model
    Wang, Yunlong
    Gao, Yanan
    Yu, Liyuan
    Shao, Xiaoshuang
    Hou, Peng
    ENGINEERING ANALYSIS WITH BOUNDARY ELEMENTS, 2024, 159 : 466 - 484
  • [44] Application of the Risk Matrix Method for Geotechnical Risk Analysis and Prediction of the Advance Rate in Rock TBM Tunneling
    Moradi, Mohammad Reza
    Farsangi, Mohammad Ali Ebrahimi
    ROCK MECHANICS AND ROCK ENGINEERING, 2014, 47 (05) : 1951 - 1960
  • [45] Application of the Risk Matrix Method for Geotechnical Risk Analysis and Prediction of the Advance Rate in Rock TBM Tunneling
    Mohammad Reza Moradi
    Mohammad Ali Ebrahimi Farsangi
    Rock Mechanics and Rock Engineering, 2014, 47 : 1951 - 1960
  • [46] Assessing cutter-rock interaction during TBM tunnelling in granite: Large-scale standing rotary cutting tests and 3D DEM simulations
    Huang, Xin
    Tang, Miaoyuan
    Wang, Shuaifeng
    Zhai, Yixin
    Zhuang, Qianwei
    Zhang, Chi
    Lei, Qinghua
    JOURNAL OF ROCK MECHANICS AND GEOTECHNICAL ENGINEERING, 2024, 16 (09) : 3595 - 3615
  • [47] Analysis and prediction of TBM disc cutter wear when tunneling in hard rock strata: A case study of a metro tunnel excavation in Shenzhen, China
    Su, Weilin
    Li, Xinggao
    Jin, Dalong
    Yang, Yi
    Qin, Ruicheng
    Wang, Xuyang
    WEAR, 2020, 446
  • [48] Hard-Rock TBM Thrust Prediction Using an Improved Two-Hidden-Layer Extreme Learning Machine
    Li, Long
    Liu, Zaobao
    Lu, Yuchi
    Wang, Fei
    Jeon, Seokwon
    IEEE ACCESS, 2022, 10 : 112695 - 112712
  • [49] Introducing an empirical model for prediction of disc cutter life for TBM application in jointed rocks: case study, Kerman water conveyance tunnel
    Morteza Karami
    Shokrollah Zare
    Jamal Rostami
    Bulletin of Engineering Geology and the Environment, 2021, 80 : 3853 - 3870
  • [50] Introducing an empirical model for prediction of disc cutter life for TBM application in jointed rocks: case study, Kerman water conveyance tunnel
    Karami, Morteza
    Zare, Shokrollah
    Rostami, Jamal
    BULLETIN OF ENGINEERING GEOLOGY AND THE ENVIRONMENT, 2021, 80 (05) : 3853 - 3870