Lifecycle Cost Analysis of Recycled Asphalt Pavements: Determining Cost of Recycled Materials for an Urban Highway Section

被引:14
作者
Hasan, Umair [1 ,2 ]
Whyte, Andrew [1 ]
Al Jassmi, Hamad [2 ,3 ]
Hasan, Aisha [2 ]
机构
[1] Curtin Univ, Sch Civil & Mech Engn, Perth, WA 6845, Australia
[2] United Arab Emirates Univ, Emirates Ctr Mobil Res, POB 15551, Al Ain, U Arab Emirates
[3] United Arab Emirates Univ, Dept Civil & Environm Engn, POB 15551, Al Ain, U Arab Emirates
来源
CIVILENG | 2022年 / 3卷 / 02期
关键词
lifecycle cost analysis; highways; scenario analyses; granulated blast furnace slag; recycled asphalt pavements; WARM MIX ASPHALT; RECLAIMED ASPHALT; CONSTRUCTION; SUSTAINABILITY; CONCRETE;
D O I
10.3390/civileng3020019
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Growing demand for road infrastructures and accompanying environmental footprint calls for the replacement of pavement materials with recycled options. The complexities in real-world usability are dependent upon project-specific characteristics and are affected by budgetary constraints of local governmental agencies, material applicability, and climatical conditions. This study conducts a comprehensive lifecycle cost analysis (LCCA) of an urban highway section "E10" in the hot Middle Eastern climate of Abu Dhabi, where virgin asphalt usage is dominant, using actual cost data under multiple scenarios and recycled construction waste (RCW) usage across aggregate layers and recycled asphalt pavement (RAP) across wearing, binder, and asphalt base courses. Blast furnace slag as partial cement replacement for road concrete works is also analysed. Impacts across all lifecycle stages from initial earthworks and construction to routine maintenance and operation were compared. Results found that cost of sustainable construction is lower. Cost reduction was highest for RAP and RCW usage, particularly when the usage was accumulated. The optimum cost scenario used 25% RCW in the sub-base, 80% RCW in the unbound base, 25% warm-mix asphalt (WMA) RAP in the asphalt base, 15% warm-mix RAP in the binder and wearing courses, and 65% slag for concrete roadworks and resulted in USD 2.6 million (15%) cost reduction over 30 years from 2015 to 2045.
引用
收藏
页码:316 / 331
页数:16
相关论文
共 53 条
[1]  
Abbas Waheed, 2017, KHALEEJ TIMES
[2]  
ADM, 1997, Standard Specifications for Road and Bridge Construction, P652
[3]  
Alshamsi KH, 2017, INVEST MANAG FINANC, V12, P132
[4]  
[Anonymous], 1998, Distribution, P107
[5]   Geotechnical characteristics of recycled crushed brick blends for pavement sub-base applications [J].
Arulrajah, A. ;
Piratheepan, J. ;
Bo, M. W. ;
Sivakugan, N. .
CANADIAN GEOTECHNICAL JOURNAL, 2012, 49 (07) :796-811
[6]   Physical properties and shear strength responses of recycled construction and demolition materials in unbound pavement base/subbase applications [J].
Arulrajah, Arul ;
Disfani, Mahdi M. ;
Horpibulsuk, Suksun ;
Suksiripattanapong, Cherdsak ;
Prongmanee, Nutthachai .
CONSTRUCTION AND BUILDING MATERIALS, 2014, 58 :245-257
[7]   Current and future pavement maintenance prioritization based on rapid visual condition evaluation [J].
Bandara, N ;
Gunaratne, M .
JOURNAL OF TRANSPORTATION ENGINEERING-ASCE, 2001, 127 (02) :116-123
[8]   Putting sustainability theory into roadway design practice: Implementation of LCA and LCCA analysis for pavement type selection in real world decision making [J].
Batouli, Mostafa ;
Bienvenu, Michael ;
Mostafavi, Ali .
TRANSPORTATION RESEARCH PART D-TRANSPORT AND ENVIRONMENT, 2017, 52 :289-302
[9]   Carbon footprint and embodied energy assessment of a civil works program in a residential estate of Western Australia [J].
Biswas, Wahidul K. .
INTERNATIONAL JOURNAL OF LIFE CYCLE ASSESSMENT, 2014, 19 (04) :732-744
[10]   A comparative environmental impact analysis of asphalt mixtures containing crumb rubber and reclaimed asphalt pavement using life cycle assessment [J].
Bressi, Sara ;
Santos, Joao ;
Oreskovic, Marko ;
Losa, Massimo .
INTERNATIONAL JOURNAL OF PAVEMENT ENGINEERING, 2021, 22 (04) :524-538