The dynamic facility location problem with mobile production units: A waste recycling application

被引:3
作者
Alarcon-Gerbier, Eduardo [1 ,2 ]
Buscher, Udo [1 ]
机构
[1] Tech Univ Dresden, Chair Business Adm, Esp Ind Management, Dresden, Germany
[2] Tech Univ Dresden, Boysen TU Dresden Res Training Grp, Dresden, Germany
关键词
Distributed manufacturing; Mobile facility; Modular capacity; Optimization; Waste management; DESIGN; HEURISTICS; EXPANSION; MODEL;
D O I
10.1016/j.cor.2024.106609
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This paper presents a multi -period location-production problem involving small recycling units that are embedded in standard containers and can, therefore, be relocated from site to site at short notice. The waste generated over time at different locations can be stored up to a specific limit, at which point recycling must occur. A mixed -integer program is implemented to plan the relocation of the mobile recycling units in such a way that the total cost resulting from waste transport and facility relocation is minimized. To solve large instances, three heuristics are developed that form the basis for a detailed computational study. The results reveal that mobile recycling units can significantly reduce the total costs compared to centralized recycling because (a) a larger number of mobile recycling units, (b) larger storage capacities, and (c) more short-term relocation possibilities increase the optimization scope and thus the possibility to reduce the total transport distances, and thereby, the costs. However, achieving this requires intelligent planning that considers the complex interdependencies between the influencing parameters and balances the existing trade-offs.
引用
收藏
页数:14
相关论文
共 44 条
[11]  
Biofabrik, 2020, Scalable solutions for global problems
[12]   A COMPARISON OF HEURISTICS AND RELAXATIONS FOR THE CAPACITATED PLANT LOCATION PROBLEM [J].
CORNUEJOLS, G ;
SRIDHARAN, R ;
THIZY, JM .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1991, 50 (03) :280-297
[13]   A Lagrangean heuristic for a modular capacitated location problem [J].
Correia, I ;
Captivo, ME .
ANNALS OF OPERATIONS RESEARCH, 2003, 122 (1-4) :141-161
[14]   Integrated facility location and capacity planning under uncertainty [J].
Correia, Isabel ;
Melo, Teresa .
COMPUTATIONAL & APPLIED MATHEMATICS, 2021, 40 (05)
[15]   A multi-period facility location problem with modular capacity adjustments and flexible demand fulfillment [J].
Correia, Isabel ;
Melo, Teresa .
COMPUTERS & INDUSTRIAL ENGINEERING, 2017, 110 :307-321
[16]   A multi-period capacitated school location problem with modular equipment and closest assignment considerations [J].
Delmelle, Eric M. ;
Thill, Jean-Claude ;
Peeters, Dominique ;
Thomas, Isabelle .
JOURNAL OF GEOGRAPHICAL SYSTEMS, 2014, 16 (03) :263-286
[17]  
Dias J.M., 2007, INVESTIGA OOPERACION, V27, P107
[18]  
Dynamis Energy, 2020, CLEAN EN WORLDS WAST
[19]   Optimization of hyperconnected mobile modular production toward environmental and economic sustainability [J].
Fergani, Charifa ;
El Idrissi, Adiba El Bouzekri ;
Marcotte, Suzanne ;
Hajjaji, Abdelowahed .
ENVIRONMENTAL SCIENCE AND POLLUTION RESEARCH, 2020, 27 (31) :39241-39252
[20]  
Flaxres, 2022, Sustainable future through smart technology