Lightning nowcasting using fuzzy logic - A risk assessment framework for resilience of microgrids

被引:1
|
作者
Ul Ain, Noor [1 ]
Mahmood, Farhan [1 ]
Tong, Chong [2 ]
Vagasky, Chris [3 ]
Rizk, Mohammad E. M. [4 ]
机构
[1] Univ Engn & Technol, Dept Elect Engn, Lahore 54890, Pakistan
[2] State Grid JiangSu Elect Power Co Ltd, State Grid Corp China, Suzhou Branch, Nanjing, Peoples R China
[3] Univ Wisconsin Madison, Madison, WI USA
[4] Mansoura Univ, Dept Elect Engn, Mansoura, Egypt
关键词
Fuzzy logic; Lightning; Microgrids; Reliability; Risk;
D O I
10.1016/j.epsr.2024.110253
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
This article presents a coordination strategy for microgrids by proposing dynamic actions for efficient energy management during a thunderstorm to mitigate the associated risk. The dynamic lightning protection system is integrated with a fuzzy logic-based lightning detection module developed using meteorological parameters, which generates an early warning at the onset of lightning and also indicates the threat level. To validate the fuzzy prediction model, the actual flashes recorded by lightning location systems are used, yielding a 98% probability of detection and a critical success index of about 75.2%. Furthermore, a risk-assessment framework is presented by estimating the probability of a particular thunderstorm rank. To mitigate the risk, power sharing commands are generated by the power system operator, conceived by implementing dq0 control of microgrid inverters. The noteworthy consequences of the proposed actions are evaluated, and the improvement in reliability indices is about 78% with dynamic actions.
引用
收藏
页数:8
相关论文
共 50 条
  • [1] Lightning risk assessment using fuzzy logic
    Gallego, LE
    Duarte, O
    Torres, H
    Vargas, M
    Montaña, J
    Pérez, E
    Herrera, J
    Younes, C
    JOURNAL OF ELECTROSTATICS, 2004, 60 (2-4) : 233 - 239
  • [2] Application of Fuzzy Logic in the Analysis of Lightning Risk
    Godoy Valladares, Yelennis
    Suarez Hernandez, Olga Susana
    REVISTA CUBANA DE INGENIERIA, 2010, 1 (03): : 31 - 39
  • [3] Fuzzy Logic Application in Risk Analysis Due to Lightning
    Godoy Valladares, Yelennis
    Suarez Hernandez, Olga Susana
    REVISTA CUBANA DE INGENIERIA, 2010, 1 (02): : 5 - 11
  • [4] A Risk Assessment Framework Based on Fuzzy Logic for Automotive Systems
    Merola, Francesco
    Bernardeschi, Cinzia
    Lami, Giuseppe
    SAFETY, 2024, 10 (02)
  • [5] Security Risk Assessment Method Using Fuzzy Logic
    Ismagilov, Ilyas I.
    Molotov, Linar A.
    Gilmullin, Timur M.
    Anikin, Igor, V
    Katasev, Alexey S.
    HELIX, 2018, 8 (06): : 4674 - 4682
  • [6] Risk assessment of bridges using Fuzzy Logic Controller
    Andric, Jelena
    Lu, Dagang
    EURODYN 2014: IX INTERNATIONAL CONFERENCE ON STRUCTURAL DYNAMICS, 2014, : 3073 - 3078
  • [7] Risk assessment method based on fuzzy logic
    Zhao, Yuan
    Jiao, Jian
    Zhao, Ting-Di
    Xi Tong Gong Cheng Yu Dian Zi Ji Shu/Systems Engineering and Electronics, 2015, 37 (08): : 1825 - 1831
  • [8] Risk Assessment of Maintenance activities using Fuzzy Logic
    Gallaba, Maryam
    Bouloiz, Hafida
    Alaoui, Youssef Lamrani
    Tkiouat, Mohamed
    SECOND INTERNATIONAL CONFERENCE ON INTELLIGENT COMPUTING IN DATA SCIENCES (ICDS2018), 2019, 148 : 226 - 235
  • [9] Fuzzy Logic-based Risk Assessment Framework to Evaluate Physiological Parameters
    Toth-Laufer, Edit
    Takacs, Marta
    Rudas, Imre J.
    ACTA POLYTECHNICA HUNGARICA, 2015, 12 (02) : 159 - 178
  • [10] Risk assessment of cost overrun using fuzzy logic model
    Alekhya, G. B. S.
    Shashikanth, K.
    Prasad, M. Anjaneya
    MATERIALS TODAY-PROCEEDINGS, 2022, 62 : 1803 - 1810