Analysis of a time-cost trade-off in a resource-constrained GERT project scheduling problem using the Markov decision process

被引:1
作者
Sadri, Shadi [1 ]
Ghomi, S. M. T. Fatemi [1 ]
Dehghanian, Amin [2 ]
机构
[1] Amirkabir Univ Technol, Dept Ind Engn, 424 Hafez Ave, Tehran 1591634311, Iran
[2] Georgia Inst Technol, H Milton Stewart Sch Ind & Syst Engn, 755 Ferst Dr NW, Atlanta, GA 30332 USA
关键词
Time-cost trade-off problem; GERT networks; Resource-constrained project scheduling; Markov decision process; Semi-Markov decision process; OPTIMIZATION MODELS; ALGORITHM;
D O I
10.1007/s10479-024-05896-8
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
Nowadays the advent of new types of projects such as startups, maintenance, and education make a revolution in project management, so that, classical project scheduling methods are incapable in analyzing of these stochastic projects. This study considers a time-cost trade-off project scheduling problem, where the structure of the project is uncertain. To deal with the uncertainties, we implemented Graphical Evaluation and Review Technique (GERT). The main aim of the study is to balance time and the amount of a non-renewable resource allocated to each activity considering the finite-time horizon and resource limitations. To preserve the generality of the model, we considered both discrete and continuous distribution functions for the activity's duration. From a methodological standpoint, we proposed an analytical approach based on the Markov Decision Process (MDP) and Semi-Markov Decision Process (SMDP) to find the probability distribution of project makespan. These models are solved using the value iteration and a finite-horizon Linear Programming (LP) model. Two randomly generated examples explain the value iteration for models in detail. Furthermore, seven example groups each with five instances are adopted from a well-known data set, PSPLIB, to validate the efficiency of the proposed models in contrast to the two extensively-studied methods, Genetic algorithm (GA) and Monte-Carlo simulation. The convergence of the GA and simulation results to those of MDP and SMDP represent the efficiency of the proposed models. Besides, conducting a sensitivity analysis on the project completion probability with respect to the available resource, gives a good insight to managers to plan their resources.
引用
收藏
页码:535 / 568
页数:34
相关论文
共 45 条
  • [1] An agency perspective for multi-mode project scheduling with time/cost trade-offs
    Aouam, Tarik
    Vanhoucke, Mario
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2019, 105 : 167 - 186
  • [2] OPTIMAL TIME-COST TRADE-OFFS IN GERT NETWORKS
    ARISAWA, S
    ELMAGHRA.SE
    [J]. MANAGEMENT SCIENCE SERIES A-THEORY, 1972, 18 (11): : 589 - 599
  • [3] Business process modelling with stochastic networks
    Aytulun, S. K.
    Guneri, A. F.
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2008, 46 (10) : 2743 - 2764
  • [4] Space Launch Vehicle Project Reliability Analysis by Using GERT
    Aytulun, S. Kerem
    Ermis, Murat
    [J]. RAST 2009: PROCEEDINGS OF THE 4TH INTERNATIONAL CONFERENCE ON RECENT ADVANCES IN SPACE TECHNOLOGIES, 2009, : 241 - 248
  • [5] Multi-objective time-cost trade-off in dynamic PERT networks using an interactive approach
    Azaron, Amir
    Tavakkoli-Moghaddam, Reza
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2007, 180 (03) : 1186 - 1200
  • [6] Brabazon A., 2015, STUD COMPUT INTELL, V28, P21, DOI 10.1007/978-3-662-43631-8_3
  • [7] Multi-mode resource-constrained project scheduling problems with non-preemptive activity splitting
    Cheng, Junzilan
    Fowler, John
    Kempf, Karl
    Mason, Scott
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2015, 53 : 275 - 287
  • [8] EIBEN AE, 1994, 3 INT C PAR PROBL SO, DOI DOI 10.1007/3-540-58484-6_252
  • [9] Fuzzy-based MOGA approach to stochastic time-cost trade-off problem
    Eshtehardian, Ehsan
    Afshar, Abbas
    Abbasnia, Reza
    [J]. AUTOMATION IN CONSTRUCTION, 2009, 18 (05) : 692 - 701
  • [10] Stochastic construction time-cost trade-off analysis
    Feng, CW
    Liu, L
    Burns, SA
    [J]. JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2000, 14 (02) : 117 - 126