Network-level pavement maintenance and rehabilitation planning considering uncertainties using chance-constrained programming

被引:0
|
作者
Cao, Rui [1 ]
Meng, Siyuan [1 ]
Feng, Shengkai [2 ]
Dong, Shi [1 ]
Bai, Qiang [1 ]
机构
[1] Changan Univ, Sch Transportat Engn, Xian, Peoples R China
[2] Howond Design Consulting Co Ltd, Xian, Peoples R China
基金
中国国家自然科学基金;
关键词
Pavement management; maintenance and rehabilitation; multi-objective optimisation; network-level performance measures; chance-constrained programming; TRADE-OFF ANALYSIS; MULTIOBJECTIVE OPTIMIZATION; ASPHALT PAVEMENT; DECISION-MAKING; DETERIORATION; MANAGEMENT; SYSTEMS; COST;
D O I
10.1080/10298436.2024.2340001
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In practice, given limited funds, to consider multiple strategic goals/objectives that different stakeholders concern, pavement network-level maintenance and rehabilitation (M&R) planning becomes a multi-objective optimisation (MOO) based project selection and budget allocation problem. In an attempt to solve this problem, most agencies established MOO models under the deterministic situation without appropriate consideration of uncertainties. However, ignoring performance uncertainties often leads to unreasonable decisions. To provide more convincing and reliable pavement M&R decisions, this paper proposes a Chance-Constrained Programming (CCP) based MOO method to incorporate performance uncertainties in network-level single period pavement M&R planning. First, a general deterministic MOO model with budget and network performance constraints is established. Then, three commonly-used statistical forms of network-level performance measures are introduced. To incorporate uncertainties, the probability distribution of each form of performance measure is derived. Based on the CCP method, the MOO model is transformed to an equivalent deterministic formulation as a mixed non-linear integer programming (MNLIP) problem. To demonstrate the proposed method, a case study using real data is conducted. The results show that the proposed method can effectively help decision-makers to appropriately incorporate performance uncertainties in conducting network-level pavement M&R planning.
引用
收藏
页数:12
相关论文
共 50 条
  • [41] Two-stage reactive power chance-constrained optimization method for an active distribution network considering DG uncertainties
    Lu, Ji
    Chang, Junxiao
    Zhang, Yunge
    E, Shiping
    Zeng, Chuihui
    Dianli Xitong Baohu yu Kongzhi/Power System Protection and Control, 2021, 49 (21): : 28 - 35
  • [42] A Chance-Constrained Programming Approach to Preoperative Planning of Robotic Cardiac Surgery Under Task-Level Uncertainty
    Azimian, Hamidreza
    Naish, Michael D.
    Kiaii, Bob
    Patel, Rajni V.
    IEEE JOURNAL OF BIOMEDICAL AND HEALTH INFORMATICS, 2015, 19 (02) : 612 - 622
  • [44] Toward equity in large-scale network-level pavement maintenance and rehabilitation scheduling using water cycle and genetic algorithms
    Naseri, Hamed
    Fani, Amirhossein
    Golroo, Amir
    INTERNATIONAL JOURNAL OF PAVEMENT ENGINEERING, 2022, 23 (04) : 1095 - 1107
  • [45] Influence of Pavement Condition Data Variability on Network-Level Maintenance Decision
    Jia, Xiaoyang
    Huang, Baoshan
    Dong, Qiao
    Zhu, Di
    Maxwell, James
    TRANSPORTATION RESEARCH RECORD, 2016, (2589) : 20 - 31
  • [46] Fuzzy distributional chance-constrained programming for handling stochastic and epistemic uncertainties during flotation processes
    Liang, Yu
    He, Dakuo
    Wang, Qingkai
    Lu, Xianlun
    CHEMICAL ENGINEERING RESEARCH & DESIGN, 2020, 164 (164): : 248 - 260
  • [47] Chance-constrained scheduling considering frequency support from electric vehicles under multiple uncertainties
    Liu, Yifeng
    Zeng, Wenyuan
    Chen, Meng
    He, Zhongshi
    Yuan, Yi
    Ding, Tao
    IET RENEWABLE POWER GENERATION, 2024, 18 : 4348 - 4359
  • [48] COTS products selection using fuzzy chance-constrained multiobjective programming
    Mukesh Kumar Mehlawat
    Pankaj Gupta
    Applied Intelligence, 2015, 43 : 732 - 751
  • [49] Optimal Reactive Power Dispatch Using Stochastic Chance-Constrained Programming
    Lopez, Julio C.
    Munoz, Jose I.
    Contreras, Javier
    Mantovani, J. R. S.
    2012 SIXTH IEEE/PES TRANSMISSION AND DISTRIBUTION: LATIN AMERICA CONFERENCE AND EXPOSITION (T&D-LA), 2012,
  • [50] COTS products selection using fuzzy chance-constrained multiobjective programming
    Mehlawat, Mukesh Kumar
    Gupta, Pankaj
    APPLIED INTELLIGENCE, 2015, 43 (04) : 732 - 751