Network-level pavement maintenance and rehabilitation planning considering uncertainties using chance-constrained programming

被引:0
|
作者
Cao, Rui [1 ]
Meng, Siyuan [1 ]
Feng, Shengkai [2 ]
Dong, Shi [1 ]
Bai, Qiang [1 ]
机构
[1] Changan Univ, Sch Transportat Engn, Xian, Peoples R China
[2] Howond Design Consulting Co Ltd, Xian, Peoples R China
基金
中国国家自然科学基金;
关键词
Pavement management; maintenance and rehabilitation; multi-objective optimisation; network-level performance measures; chance-constrained programming; TRADE-OFF ANALYSIS; MULTIOBJECTIVE OPTIMIZATION; ASPHALT PAVEMENT; DECISION-MAKING; DETERIORATION; MANAGEMENT; SYSTEMS; COST;
D O I
10.1080/10298436.2024.2340001
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In practice, given limited funds, to consider multiple strategic goals/objectives that different stakeholders concern, pavement network-level maintenance and rehabilitation (M&R) planning becomes a multi-objective optimisation (MOO) based project selection and budget allocation problem. In an attempt to solve this problem, most agencies established MOO models under the deterministic situation without appropriate consideration of uncertainties. However, ignoring performance uncertainties often leads to unreasonable decisions. To provide more convincing and reliable pavement M&R decisions, this paper proposes a Chance-Constrained Programming (CCP) based MOO method to incorporate performance uncertainties in network-level single period pavement M&R planning. First, a general deterministic MOO model with budget and network performance constraints is established. Then, three commonly-used statistical forms of network-level performance measures are introduced. To incorporate uncertainties, the probability distribution of each form of performance measure is derived. Based on the CCP method, the MOO model is transformed to an equivalent deterministic formulation as a mixed non-linear integer programming (MNLIP) problem. To demonstrate the proposed method, a case study using real data is conducted. The results show that the proposed method can effectively help decision-makers to appropriately incorporate performance uncertainties in conducting network-level pavement M&R planning.
引用
收藏
页数:12
相关论文
共 50 条
  • [31] Optimal Reactive Power Planning Using Two-Stage Stochastic Chance-Constrained Programming
    Lopez, Julio C.
    Mantovani, J. R. S.
    Contreras Sanz, Javier
    Munoz, Jose I.
    2013 IEEE GRENOBLE POWERTECH (POWERTECH), 2013,
  • [32] On the scheduling of lifecycle network-level pavement maintenance: modelling and applications
    Deng, Fuwen
    Jin, Jiandong
    Chen, Xiaobo
    Zhao, Feng
    INTERNATIONAL JOURNAL OF PAVEMENT ENGINEERING, 2023, 24 (02)
  • [33] AN INSURANCE AND INVESTMENT PORTFOLIO MODEL USING CHANCE-CONSTRAINED PROGRAMMING
    LI, SX
    OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 1995, 23 (05): : 577 - 585
  • [34] USING CHANCE-CONSTRAINED PROGRAMMING FOR ANIMAL FEED FORMULATION AT AGWAY
    ROUSH, WB
    STOCK, RH
    CRAVENER, TL
    DALFONSO, TH
    INTERFACES, 1994, 24 (02) : 53 - 58
  • [35] A chance-constrained programming model for airport ground movement optimisation with taxi time uncertainties
    Wang, Xinwei
    Brownlee, Alexander E., I
    Weiszer, Michal
    Woodward, John R.
    Mahfouf, Mahdi
    Chen, Jun
    TRANSPORTATION RESEARCH PART C-EMERGING TECHNOLOGIES, 2021, 132
  • [36] Chance-Constrained Programming Model for Reference Network With Wind Power Integration
    Sun, Donglei
    Yang, Jinhong
    Han, Xueshan
    Wang, Junxiong
    Tian, Xin
    Yang, Bin
    Zhang, Lina
    Wang, Nan
    2017 IEEE CONFERENCE ON ENERGY INTERNET AND ENERGY SYSTEM INTEGRATION (EI2), 2017,
  • [37] A Planning Method for Siting and Sizing of Distributed Generation Based on Chance-constrained Programming
    Sun, Zhaoxia
    Li, Weiwei
    Zhu, Jinfeng
    Liu, Qiangmin
    Liu, Tianci
    2015 5TH INTERNATIONAL CONFERENCE ON ELECTRIC UTILITY DEREGULATION AND RESTRUCTURING AND POWER TECHNOLOGIES (DRPT 2015), 2015, : 527 - 531
  • [38] Dual inexact fuzzy chance-constrained programming for planning waste management systems
    Cao, M. F.
    Huang, G. H.
    Sun, Y.
    Xu, Y.
    Yao, Y.
    STOCHASTIC ENVIRONMENTAL RESEARCH AND RISK ASSESSMENT, 2010, 24 (08) : 1163 - 1174
  • [39] HVAC operation planning for electric bus trips based on chance-constrained programming
    Bie, Yiming
    Liu, Yajun
    Li, Shiwu
    Wang, Linhong
    ENERGY, 2022, 258
  • [40] Dual inexact fuzzy chance-constrained programming for planning waste management systems
    M. F. Cao
    G. H. Huang
    Y. Sun
    Y. Xu
    Y. Yao
    Stochastic Environmental Research and Risk Assessment, 2010, 24 : 1163 - 1174