Data exploration on factors that influences construction cost and time performance on construction project sites

被引:28
|
作者
Amusan, Lekan M. [1 ]
Afolabi, Adedeji [1 ]
Ojelabi, Raphael [1 ]
Omuh, Ignatius [1 ]
Okagbue, Hilary, I [2 ]
机构
[1] Covenant Univ, Dept Bldg Technol, Ota, Nigeria
[2] Covenant Univ, Dept Math, Ota, Nigeria
来源
DATA IN BRIEF | 2018年 / 17卷
关键词
Likert scale; Questionnaire; Construction; Cost overrun; Severity index; Survey; Statistics;
D O I
10.1016/j.dib.2018.02.035
中图分类号
O [数理科学和化学]; P [天文学、地球科学]; Q [生物科学]; N [自然科学总论];
学科分类号
07 ; 0710 ; 09 ;
摘要
This data article explores the factors that contribute to maintaining steady cost projection on construction projects. The data was obtained using structured questionnaire designed in Likert scale. The responses were solicited from category of construction practitioners. Simple random sampling was employed in the distribution of the questionnaires to the respondents. Data samples were analysed using severity index, ranking and simple percentages. The analysis of the data brought to fore some important data on factors that causes cost overrun, they include: contractor's inexperience, inadequate planning, inflation, incessant variation order, and change in project design. They are critical to causing cost overrun, while project complexity, shortening of project period and fraudulent practices are found to be responsible. The data fall within the percentages of possible consequences of cost overrun when compared with those available in scientific literature. The data can provide insights on how to mitigate the risks of project deviation from initial cost and as-built project. (C) 2018 The Authors. Published by Elsevier Inc.
引用
收藏
页码:1320 / 1325
页数:6
相关论文
共 50 条
  • [41] Time-cost relationship for predicting construction duration
    Czarnigowska, A.
    Sobotka, A.
    ARCHIVES OF CIVIL AND MECHANICAL ENGINEERING, 2013, 13 (04) : 518 - 526
  • [42] A cost performance analysis of transport infrastructure construction in Slovenia
    Dejan Makovšek
    Polona Tominc
    Klavdij Logožar
    Transportation, 2012, 39 : 197 - 214
  • [43] A cost performance analysis of transport infrastructure construction in Slovenia
    Makovsek, Dejan
    Tominc, Polona
    Logozar, Klavdij
    TRANSPORTATION, 2012, 39 (01) : 197 - 214
  • [44] Cost Diverge in Road Construction Activities as a Function of Project's Characteristics
    Mahamid, Ibrahim
    Bruland, Amund
    PROCEEDINGS OF 2011 INTERNATIONAL CONFERENCE ON CONSTRUCTION AND REAL ESTATE MANAGEMENT, VOLS 1 AND 2, 2011, : 926 - 929
  • [45] The contributions of construction material waste to project cost overruns in Abuja, Nigeria
    Saidu, Ibrahim
    Shakantu, Winston
    ACTA STRUCTILIA, 2016, 23 (01) : 99 - 113
  • [46] PROJECT DELAY: KEY ELECTRICAL CONSTRUCTION FACTORS IN HONG KONG
    Chiu, Betty W. Y.
    Lai, Joseph H. K.
    JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2017, 23 (07) : 847 - 857
  • [47] Effects of project's physical characteristics on cost deviation in road construction
    Mahamid, Ibrahim
    Journal of King Saud University - Engineering Sciences, 2013, 25 (01) : 81 - 88
  • [48] A risk and cost management analysis for changes during the construction phase of a project
    Schoonwinkel, S.
    Fourie, C. J.
    Conradie, P. D. F.
    JOURNAL OF THE SOUTH AFRICAN INSTITUTION OF CIVIL ENGINEERING, 2016, 58 (04) : 21 - 28
  • [49] Analysis of factors affecting sustainable performance in construction sites using fuzzy AHP-WASPAS methods
    Bathrinath, S.
    Mohan, S.
    Koppiahraj, K.
    Bhalaji, R. K. A.
    Santhi, B.
    MATERIALS TODAY-PROCEEDINGS, 2022, 62 : 3118 - 3121
  • [50] XML-based standards for construction project data exchange
    Zhu, YM
    Froese, T
    Issa, R
    PROCEEDINGS OF THE 2004 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, 2004, : 142 - 144