Data exploration on factors that influences construction cost and time performance on construction project sites

被引:28
|
作者
Amusan, Lekan M. [1 ]
Afolabi, Adedeji [1 ]
Ojelabi, Raphael [1 ]
Omuh, Ignatius [1 ]
Okagbue, Hilary, I [2 ]
机构
[1] Covenant Univ, Dept Bldg Technol, Ota, Nigeria
[2] Covenant Univ, Dept Math, Ota, Nigeria
来源
DATA IN BRIEF | 2018年 / 17卷
关键词
Likert scale; Questionnaire; Construction; Cost overrun; Severity index; Survey; Statistics;
D O I
10.1016/j.dib.2018.02.035
中图分类号
O [数理科学和化学]; P [天文学、地球科学]; Q [生物科学]; N [自然科学总论];
学科分类号
07 ; 0710 ; 09 ;
摘要
This data article explores the factors that contribute to maintaining steady cost projection on construction projects. The data was obtained using structured questionnaire designed in Likert scale. The responses were solicited from category of construction practitioners. Simple random sampling was employed in the distribution of the questionnaires to the respondents. Data samples were analysed using severity index, ranking and simple percentages. The analysis of the data brought to fore some important data on factors that causes cost overrun, they include: contractor's inexperience, inadequate planning, inflation, incessant variation order, and change in project design. They are critical to causing cost overrun, while project complexity, shortening of project period and fraudulent practices are found to be responsible. The data fall within the percentages of possible consequences of cost overrun when compared with those available in scientific literature. The data can provide insights on how to mitigate the risks of project deviation from initial cost and as-built project. (C) 2018 The Authors. Published by Elsevier Inc.
引用
收藏
页码:1320 / 1325
页数:6
相关论文
共 50 条
  • [31] Dissecting the project anatomy: Understanding the cost of managing construction projects
    Haaskjold, Haavard
    Andersen, Bjorn
    Langlo, Jan Alexander
    PRODUCTION PLANNING & CONTROL, 2023, 34 (02) : 117 - 138
  • [32] Causal Factors of Corruption in Construction Project Management: An Overview
    Owusu, Emmanuel Kingsford
    Chan, Albert P. C.
    Shan, Ming
    SCIENCE AND ENGINEERING ETHICS, 2019, 25 (01) : 1 - 31
  • [33] Application of Time Buffers to Construction Project Task Durations
    Russell, Marion M.
    Howell, Gregory
    Hsiang, Simon M.
    Liu, Min
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2013, 139 (10)
  • [34] Measuring Project Management Performance: Case of Construction Industry
    Demirkesen, Sevilay
    Ozorhon, Beliz
    ENGINEERING MANAGEMENT JOURNAL, 2017, 29 (04) : 258 - 277
  • [35] The analysis of supply chain performance measurement at construction project
    Wibowo, M. Agung
    Sholeh, Moh Nur
    CIVIL ENGINEERING INNOVATION FOR A SUSTAINABLE, 2015, 125 : 25 - 31
  • [36] The effect of customer focus competence on construction project performance
    Fink, Laura
    SELECTED PAPERS FROM THE 27TH IPMA (INTERNATIONAL PROJECT MANAGEMENT ASSOCIATION), 2014, 119 : 427 - 436
  • [37] Effects of team diversity on project performance in construction projects
    Wu, Guangdong
    Zhao, Xianbo
    Zuo, Jian
    Zillante, George
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2019, 26 (03) : 408 - 423
  • [38] Dealing with construction cost overruns using data mining
    Ahiaga-Dagbui, Dominic D.
    Smith, Simon D.
    CONSTRUCTION MANAGEMENT AND ECONOMICS, 2014, 32 (7-8) : 682 - 694
  • [39] SIGNIFICANT FACTORS CAUSING TIME AND COST OVERRUNS IN CONSTRUCTION PROJECTS IN THE GAZA STRIP: CONTRACTORS' PERSPECTIVE
    Enshassi, Adnan
    Kumaraswamy, Mohan
    Al-Najjar, Jomah
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2010, 10 (01) : 35 - 60
  • [40] FACTORS INFLUENCING UNSAFE BEHAVIORS AND ACCIDENTS ON CONSTRUCTION SITES: A REVIEW
    Khosravi, Yahya
    Asilian-Mahabadi, Hassan
    Hajizadeh, Ebrahim
    Hassanzadeh-Rangi, Narmin
    Bastani, Hamid
    Behzadan, Amir H.
    INTERNATIONAL JOURNAL OF OCCUPATIONAL SAFETY AND ERGONOMICS, 2014, 20 (01) : 111 - 125