Data exploration on factors that influences construction cost and time performance on construction project sites

被引:28
|
作者
Amusan, Lekan M. [1 ]
Afolabi, Adedeji [1 ]
Ojelabi, Raphael [1 ]
Omuh, Ignatius [1 ]
Okagbue, Hilary, I [2 ]
机构
[1] Covenant Univ, Dept Bldg Technol, Ota, Nigeria
[2] Covenant Univ, Dept Math, Ota, Nigeria
来源
DATA IN BRIEF | 2018年 / 17卷
关键词
Likert scale; Questionnaire; Construction; Cost overrun; Severity index; Survey; Statistics;
D O I
10.1016/j.dib.2018.02.035
中图分类号
O [数理科学和化学]; P [天文学、地球科学]; Q [生物科学]; N [自然科学总论];
学科分类号
07 ; 0710 ; 09 ;
摘要
This data article explores the factors that contribute to maintaining steady cost projection on construction projects. The data was obtained using structured questionnaire designed in Likert scale. The responses were solicited from category of construction practitioners. Simple random sampling was employed in the distribution of the questionnaires to the respondents. Data samples were analysed using severity index, ranking and simple percentages. The analysis of the data brought to fore some important data on factors that causes cost overrun, they include: contractor's inexperience, inadequate planning, inflation, incessant variation order, and change in project design. They are critical to causing cost overrun, while project complexity, shortening of project period and fraudulent practices are found to be responsible. The data fall within the percentages of possible consequences of cost overrun when compared with those available in scientific literature. The data can provide insights on how to mitigate the risks of project deviation from initial cost and as-built project. (C) 2018 The Authors. Published by Elsevier Inc.
引用
收藏
页码:1320 / 1325
页数:6
相关论文
共 50 条
  • [21] HUMAN-DATA INTERACTION AS A CRITICAL ENABLER OF ELECTRONIC PERFORMANCE MONITORING AT CONSTRUCTION SITES
    Calvetti, Diego
    Kifokeris, Dimosthenis
    Meda, Pedro
    Sousa, Hipolito
    JOURNAL OF INFORMATION TECHNOLOGY IN CONSTRUCTION, 2024, 29 : 722 - 749
  • [22] Factors that influence the construction safety performance
    Rodrigues, Fernanda
    Coutinho, Andreia
    Cardoso, Claudino
    OCCUPATIONAL SAFETY AND HYGIENE - SHO2013, 2013, : 439 - 441
  • [23] Forecast models for actual construction time and cost
    Skitmore, RM
    Ng, ST
    BUILDING AND ENVIRONMENT, 2003, 38 (08) : 1075 - 1083
  • [24] The 'context' of transport project cost performance: Insights from contract award to final construction costs
    Love, Peter E. D.
    Ika, Lavagnon A.
    RESEARCH IN TRANSPORTATION ECONOMICS, 2021, 90
  • [25] Fuzzy assessment of the risk factors causing cost overrun in construction industry
    Sharma, Savita
    Goyal, Pradeep K.
    EVOLUTIONARY INTELLIGENCE, 2022, 15 (04) : 2269 - 2281
  • [26] Fuzzy assessment of the risk factors causing cost overrun in construction industry
    Savita Sharma
    Pradeep K. Goyal
    Evolutionary Intelligence, 2022, 15 : 2269 - 2281
  • [27] Investigating profitability performance of construction projects using big data: A project analytics approach
    Bilal, Muhammad
    Oyedele, Lukumon O.
    Kusimo, Habeeb O.
    Owolabi, Hakeem A.
    Akanbi, Lukman A.
    Ajayi, Anuoluwapo O.
    Akinade, Olugbenga O.
    Delgado, Juan Manuel Davila
    JOURNAL OF BUILDING ENGINEERING, 2019, 26
  • [28] Critical Success Factors for Construction Project Management in Nigeria
    Musa, Mohammed Mukhtar
    Bin Amirudin, Roslan
    Dalhatu, Abdussalam
    Musa, Mohammed Aminu
    ADVANCED SCIENCE LETTERS, 2018, 24 (05) : 3809 - 3813
  • [29] Causal Factors of Corruption in Construction Project Management: An Overview
    Emmanuel Kingsford Owusu
    Albert P. C. Chan
    Ming Shan
    Science and Engineering Ethics, 2019, 25 : 1 - 31
  • [30] Explaining Time Performance of Construction Arbitration
    Abwunza, Allan A.
    Peter, Titus K.
    Muigua, Kariuki
    JOURNAL OF LEGAL AFFAIRS AND DISPUTE RESOLUTION IN ENGINEERING AND CONSTRUCTION, 2021, 13 (02)