Data exploration on factors that influences construction cost and time performance on construction project sites

被引:28
|
作者
Amusan, Lekan M. [1 ]
Afolabi, Adedeji [1 ]
Ojelabi, Raphael [1 ]
Omuh, Ignatius [1 ]
Okagbue, Hilary, I [2 ]
机构
[1] Covenant Univ, Dept Bldg Technol, Ota, Nigeria
[2] Covenant Univ, Dept Math, Ota, Nigeria
来源
DATA IN BRIEF | 2018年 / 17卷
关键词
Likert scale; Questionnaire; Construction; Cost overrun; Severity index; Survey; Statistics;
D O I
10.1016/j.dib.2018.02.035
中图分类号
O [数理科学和化学]; P [天文学、地球科学]; Q [生物科学]; N [自然科学总论];
学科分类号
07 ; 0710 ; 09 ;
摘要
This data article explores the factors that contribute to maintaining steady cost projection on construction projects. The data was obtained using structured questionnaire designed in Likert scale. The responses were solicited from category of construction practitioners. Simple random sampling was employed in the distribution of the questionnaires to the respondents. Data samples were analysed using severity index, ranking and simple percentages. The analysis of the data brought to fore some important data on factors that causes cost overrun, they include: contractor's inexperience, inadequate planning, inflation, incessant variation order, and change in project design. They are critical to causing cost overrun, while project complexity, shortening of project period and fraudulent practices are found to be responsible. The data fall within the percentages of possible consequences of cost overrun when compared with those available in scientific literature. The data can provide insights on how to mitigate the risks of project deviation from initial cost and as-built project. (C) 2018 The Authors. Published by Elsevier Inc.
引用
收藏
页码:1320 / 1325
页数:6
相关论文
共 50 条
  • [1] A study and identification of the time and cost overrun in the construction project
    Chandragiri, Anand babu
    Jeelani, Syed Hamim
    Akthar, Salim
    Lingeshwaran, N.
    MATERIALS TODAY-PROCEEDINGS, 2021, 47 : 5426 - 5431
  • [2] Factors contributing to project time and hence cost overrun in the Malaysian construction industry
    Shehu, Zayyana
    Endut, Intan
    Akintoye, Akintola
    JOURNAL OF FINANCIAL MANAGEMENT OF PROPERTY AND CONSTRUCTION, 2014, 19 (01) : 55 - +
  • [3] Inhibiting Factors of Cost Performance in UAE Construction Projects
    Alhammadi, Ahmed Salem Ahmed Marey
    Memon, Aftab Hameed
    INTERNATIONAL JOURNAL OF SUSTAINABLE CONSTRUCTION ENGINEERING AND TECHNOLOGY, 2020, 11 (02): : 126 - 132
  • [4] Multiagent robotic systems and exploration algorithms: Applications for data collection in construction sites
    Prieto, Samuel A.
    Giakoumidis, Nikolaos
    de Soto, Borja Garcia
    JOURNAL OF FIELD ROBOTICS, 2024, 41 (04) : 1187 - 1203
  • [5] Time Overrun in Construction Project
    Othman, I
    Shafiq, Nasir
    Nuruddin, M. F.
    INTERNATIONAL CONFERENCE ON ARCHITECTURE AND CIVIL ENGINEERING (ICACE 2017), 2018, 291
  • [6] Cost and time risk factors in construction projects in the Dominican Republic
    Fernandez-Valderrama, Pedro
    Urena-Estrella, Crismal
    Moyano, Juan
    Bienvenido-Huertas, David
    FRONTIERS IN BUILT ENVIRONMENT, 2024, 10
  • [7] Silica exposure on construction sites: Results of an exposure monitoring data compilation project
    Flanagan, ME
    Seixas, N
    Becker, P
    Takacs, B
    Camp, J
    JOURNAL OF OCCUPATIONAL AND ENVIRONMENTAL HYGIENE, 2006, 3 (03) : 144 - 152
  • [8] Analysis of the Factors Affecting Construction Project Cost during COVID-19
    Adepu, Nikhitha
    Kermanshachi, Sharareh
    Pamidimukkala, Apurva
    Loganathan, Karthikeyan
    INTERNATIONAL CONFERENCE ON TRANSPORTATION AND DEVELOPMENT 2023: TRANSPORTATION PLANNING, OPERATIONS, AND TRANSIT, 2023, : 718 - 727
  • [9] Analysis of Cost of Rework on Time and Cost Performance of Building Construction Projects in Abuja, Nigeria
    Eze, Emmanuel Chidiebere
    Idiake, John Ebhohimen
    INTERNATIONAL JOURNAL OF BUILT ENVIRONMENT AND SUSTAINABILITY, 2018, 5 (01): : 56 - 67
  • [10] Analytical Study of Risk affecting time, cost and quality of road construction project in Iraq
    Ali, Arsalan Mohammed
    Parseiy, Mahmood
    JOURNAL OF ALGEBRAIC STATISTICS, 2022, 13 (02) : 915 - 923