Mitigation of Delays Attributable to the Contractors in the Construction Industry of Sri Lanka - Consultants' Perspective
被引:2
|
作者:
Dolage, D. A. R.
论文数: 0引用数: 0
h-index: 0
机构:
Open Univ Sri Lanka, Dept Civil Engn, Colombo, Sri LankaOpen Univ Sri Lanka, Dept Civil Engn, Colombo, Sri Lanka
Dolage, D. A. R.
[1
]
Pathmarajah, T.
论文数: 0引用数: 0
h-index: 0
机构:
Rd Dev Author, Polonnaruwa, Sri LankaOpen Univ Sri Lanka, Dept Civil Engn, Colombo, Sri Lanka
Pathmarajah, T.
[2
]
机构:
[1] Open Univ Sri Lanka, Dept Civil Engn, Colombo, Sri Lanka
[2] Rd Dev Author, Polonnaruwa, Sri Lanka
来源:
ENGINEER-JOURNAL OF THE INSTITUTION OF ENGINEERS SRI LANKA
|
2015年
/
48卷
/
01期
关键词:
Construction delays;
Construction industry;
Causes of delay;
D O I:
10.4038/engineer.v48i1.6845
中图分类号:
T [工业技术];
学科分类号:
08 ;
摘要:
This study focuses on determining important causes of construction delays attributable to contractors in large construction projects in Sri Lanka and the degree of severity of these causes. The causes of delay have been found based on the perceptions of the engineers working for three state affiliated establishments namely, Department of Buildings (BD), Road Development Authority (RDA) & National Water Supply and Drainage Board (NWSDB). The severity of each cause of delay is measured and represented through a severity index (SI). The causes of delay were determined and ranked in the descending order of severity. According to the findings, Poor project planning & scheduling (SI -82.54) is the most influencing factor causing delays in construction projects. In the descending order of severity, the other causes of delay are Low profit margin (SI -80.28), Inadequate cash flow management (SI -78.31), Handling of too many project sat a given time (SI -75.21), and Incompetence of the key staff (SI -74.93). Spearman rank correlation coefficient was used to determine the degree of agreement on the ranking of severity of causes of delay among the organisations. The highest degree of agreement is between BD & NWSDB (0.77). There exists an intermediate degree of agreement between RDA & NWSDB (0.73) and the lowest is between RDA & BD (0.70). The study finally makes 10 recommendations to mitigate construction delays.
机构:
Univ Moratuwa, Dept Bldg Econ, Moratuwa 10400, Western Provinc, Sri LankaUniv Moratuwa, Dept Bldg Econ, Moratuwa 10400, Western Provinc, Sri Lanka
Fernando, Charith Kaushalya
Hosseini, M. Reza
论文数: 0引用数: 0
h-index: 0
机构:
Deakin Univ, Sch Architecture & Built Environm, Locked Bag 20001, Geelong, Vic 3220, AustraliaUniv Moratuwa, Dept Bldg Econ, Moratuwa 10400, Western Provinc, Sri Lanka
Hosseini, M. Reza
Zavadskas, Edmundas Kazimieras
论文数: 0引用数: 0
h-index: 0
机构:
Vilnius Gediminas Tech Univ, Dept Construct Technol & Management, Sauletekio Al 11, LT-10223 Vilnius, LithuaniaUniv Moratuwa, Dept Bldg Econ, Moratuwa 10400, Western Provinc, Sri Lanka
Zavadskas, Edmundas Kazimieras
Perera, B. A. K. S.
论文数: 0引用数: 0
h-index: 0
机构:
Univ Moratuwa, Dept Bldg Econ, Moratuwa 10400, Western Provinc, Sri LankaUniv Moratuwa, Dept Bldg Econ, Moratuwa 10400, Western Provinc, Sri Lanka
Perera, B. A. K. S.
Rameezdeen, Raufdeen
论文数: 0引用数: 0
h-index: 0
机构:
Univ South Australia, Sch Nat & Built Environm, Adelaide, SA 5001, AustraliaUniv Moratuwa, Dept Bldg Econ, Moratuwa 10400, Western Provinc, Sri Lanka
机构:
Western Sydney Univ, Ctr Smart Modern Construction c4SMC, Sch Engn Design & Built Environm, Sydney, AustraliaWestern Sydney Univ, Ctr Smart Modern Construction c4SMC, Sch Engn Design & Built Environm, Sydney, Australia
Gamage, Namal
Ambagala, A. P. Krishni Kavindya
论文数: 0引用数: 0
h-index: 0
机构:
Western Sydney Univ, Ctr Smart Modern Construction c4SMC, Sch Engn Design & Built Environm, Sydney, Australia
Univ Adelaide, Adelaide, AustraliaWestern Sydney Univ, Ctr Smart Modern Construction c4SMC, Sch Engn Design & Built Environm, Sydney, Australia
Ambagala, A. P. Krishni Kavindya
Nanayakkara, Samudaya
论文数: 0引用数: 0
h-index: 0
机构:
Western Sydney Univ, Ctr Smart Modern Construction c4SMC, Sch Engn Design & Built Environm, Sydney, AustraliaWestern Sydney Univ, Ctr Smart Modern Construction c4SMC, Sch Engn Design & Built Environm, Sydney, Australia
Nanayakkara, Samudaya
Perera, Srinath
论文数: 0引用数: 0
h-index: 0
机构:
Western Sydney Univ, Ctr Smart Modern Construction c4SMC, Sch Engn Design & Built Environm, Sydney, AustraliaWestern Sydney Univ, Ctr Smart Modern Construction c4SMC, Sch Engn Design & Built Environm, Sydney, Australia
机构:
Univ Moratuwa, Dept Bldg Econ, Moratuwa, Sri LankaC Quest Project Dev & Cost Consultants, Dubai, U Arab Emirates
Thayaparan, Menaha
Weerasinghe, Lichini Nikesha Kumari
论文数: 0引用数: 0
h-index: 0
机构:
Hong Kong Polytech Univ, Dept Bldg & Real Estate, Hung Hom, Hong Kong, Peoples R ChinaC Quest Project Dev & Cost Consultants, Dubai, U Arab Emirates
Weerasinghe, Lichini Nikesha Kumari
Attfield, Alexander
论文数: 0引用数: 0
h-index: 0
机构:
Cost & Commercial Management, Al Khobar, Saudi ArabiaC Quest Project Dev & Cost Consultants, Dubai, U Arab Emirates