Underground long-term mine production scheduling with integrated geological risk management

被引:37
|
作者
Carpentier, S. [1 ,2 ]
Gamache, M. [1 ,3 ]
Dimitrakopoulos, R. [2 ,3 ]
机构
[1] Ecole Polytech, Dept Math & Ind Engn, Montreal, PQ, Canada
[2] McGill Univ, Dept Min & Mat Engn, COSMO Stochast Mine Planning Lab, Montreal, PQ, Canada
[3] Res Grp Decis Anal GERAD, Montreal, PQ, Canada
基金
加拿大自然科学与工程研究理事会;
关键词
Underground mine; Stochastic optimisation; Production scheduling; Long-term-planning; Geological uncertainty;
D O I
10.1179/1743286315Y.0000000026
中图分类号
TD [矿业工程];
学科分类号
0819 ;
摘要
A stochastic integer programming (SIP) model is presented to optimise long-term scheduling of underground mine operations while considering geological uncertainty. To integrate this uncertainty, a set of stochastic simulations is generated, corresponding to representations of the deposit, and is used as primary inputs to optimisation. The two-stage SIP model developed considers a variable cut-off grade and accounts for maximum development, material handling flow conservation, mill and mine capacity, and activity precedencies for an underground nickel mine. The results show that the schedule generated has a higher expected value when considering and managing grade risk. They also demonstrate the benefits of risk control, which this approach allows.
引用
收藏
页码:93 / 102
页数:10
相关论文
共 50 条
  • [41] Contribution to the long-term generation scheduling of the Cameroonian electricity production system
    Simo, Theophile
    Kenfack, Francois
    Ngundam, John M.
    ELECTRIC POWER SYSTEMS RESEARCH, 2007, 77 (10) : 1265 - 1273
  • [42] The application of a stockpile stochastic model into long-term open pit mine production scheduling to improve the feed grade for the processing plant
    Gholamnejad, Javad
    Azimi, Ali
    Lotfian, Reza
    Kasmaeeyazdi, Sara
    Tinti, Francesco
    RUDARSKO-GEOLOSKO-NAFTNI ZBORNIK, 2020, 35 (04): : 115 - 129
  • [43] LONG-TERM MINE PLANNING AT SYNCRUDE
    DONALD, D
    CIM BULLETIN, 1988, 81 (911): : 98 - &
  • [44] INTEGRATED APPROACHES TO LONG-TERM CONDITION MANAGEMENT IN PRIMARY CARE
    Mallen, C. D.
    ANNALS OF THE RHEUMATIC DISEASES, 2013, 72 : 16 - 16
  • [45] Period Cycle Optimization of Integrated Energy Systems with Long-Term Scheduling Consideration
    Ye, Daoyu
    Deng, Shengxiang
    ALGORITHMS, 2023, 16 (11)
  • [46] A heuristic traditional MIP solving approach for long term production scheduling in open pit mine
    Rafiee, Vahid
    Asghari, Omid
    Journal of Applied Sciences, 2008, 8 (24) : 4512 - 4522
  • [47] Outsourcing in long-term care - a risk management approach
    Guimaraes, Cristina Machado
    de Carvalho, Jose Crespo
    CIENCIA & SAUDE COLETIVA, 2012, 17 (05): : 1179 - 1190
  • [48] Long-term experiences with pluvial flood risk management
    Fritsch, Kathrina
    Assmann, Andre
    Tyrna, Bernd
    3RD EUROPEAN CONFERENCE ON FLOOD RISK MANAGEMENT (FLOODRISK 2016), 2016, 7
  • [49] LONG-TERM RISK ASSESSMENT OF RADIOACTIVE-WASTE DISPOSAL IN GEOLOGICAL FORMATIONS
    GIRARDI, F
    BERTOZZI, G
    DALESSANDRO, M
    TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1977, 26 : 275 - 277
  • [50] Environmental management considerations for a mine site under long-term care and maintenance
    Zurkirchen, L
    Mchaina, DM
    PROCEEDINGS OF THE TWENTY-THIRD ANNUAL BRITISH COLUMBIA MINE RECLAMATION SYMPOSIUM: MINE DECOMMISSIONING, 1999, : 136 - 145