Underground long-term mine production scheduling with integrated geological risk management

被引:37
作者
Carpentier, S. [1 ,2 ]
Gamache, M. [1 ,3 ]
Dimitrakopoulos, R. [2 ,3 ]
机构
[1] Ecole Polytech, Dept Math & Ind Engn, Montreal, PQ, Canada
[2] McGill Univ, Dept Min & Mat Engn, COSMO Stochast Mine Planning Lab, Montreal, PQ, Canada
[3] Res Grp Decis Anal GERAD, Montreal, PQ, Canada
来源
TRANSACTIONS OF THE INSTITUTIONS OF MINING AND METALLURGY SECTION A-MINING TECHNOLOGY | 2016年 / 125卷 / 02期
基金
加拿大自然科学与工程研究理事会;
关键词
Underground mine; Stochastic optimisation; Production scheduling; Long-term-planning; Geological uncertainty;
D O I
10.1179/1743286315Y.0000000026
中图分类号
TD [矿业工程];
学科分类号
0819 ;
摘要
A stochastic integer programming (SIP) model is presented to optimise long-term scheduling of underground mine operations while considering geological uncertainty. To integrate this uncertainty, a set of stochastic simulations is generated, corresponding to representations of the deposit, and is used as primary inputs to optimisation. The two-stage SIP model developed considers a variable cut-off grade and accounts for maximum development, material handling flow conservation, mill and mine capacity, and activity precedencies for an underground nickel mine. The results show that the schedule generated has a higher expected value when considering and managing grade risk. They also demonstrate the benefits of risk control, which this approach allows.
引用
收藏
页码:93 / 102
页数:10
相关论文
共 50 条
  • [21] Long-term plant-level scheduling with uncertainty in the plywood industry
    Osz, Oliver
    David, Balazs
    Garab, Jozsef
    Hegyhati, Mate
    10TH HARDWOOD CONFERENCE PROCEEDINGS 2022, 2022, : 263 - 270
  • [22] Incorporation of geometallurgical modelling into long-term production planning
    Navarra, A.
    Grammatikopoulos, T.
    Waters, K.
    MINERALS ENGINEERING, 2018, 120 : 118 - 126
  • [23] Long-term production scheduling of open pit mines using particle swarm and bat algorithms under grade uncertainty
    Khan, A.
    JOURNAL OF THE SOUTHERN AFRICAN INSTITUTE OF MINING AND METALLURGY, 2018, 118 (04) : 361 - 368
  • [24] Sustainable long-term production planning of open pit mines: An integrated framework for concurrent economical and environmental optimization
    Mirzehi M.
    Moradi Afrapoli A.
    Resources Policy, 2024, 94
  • [25] Designing long-term policy: rethinking transition management
    Jan-Peter Voß
    Adrian Smith
    John Grin
    Policy Sciences, 2009, 42 : 275 - 302
  • [26] Designing long-term policy: rethinking transition management
    Voss, Jan-Peter
    Smith, Adrian
    Grin, John
    POLICY SCIENCES, 2009, 42 (04) : 275 - 302
  • [27] A Multi-Stage Methodology for Long-Term Open-Pit Mine Production Planning under Ore Grade Uncertainty
    Jelvez, Enrique
    Ortiz, Julian
    Varela, Nelson Morales
    Askari-Nasab, Hooman
    Nelis, Gonzalo
    MATHEMATICS, 2023, 11 (18)
  • [28] Stochastic short-term integrated electricity procurement and production scheduling for a large consumer
    Leo, Egidio
    Ave, Giancarlo Dalle
    Harjunkoski, Iiro
    Engell, Sebastian
    COMPUTERS & CHEMICAL ENGINEERING, 2021, 145
  • [29] A simulated annealing based stochastic long-term production scheduling of open-pit mines with stockpiling under grade uncertainty
    Danish, Abid Ali Khan
    Khan, Asif
    Muhammad, Khan
    INTERNATIONAL JOURNAL OF MINING RECLAMATION AND ENVIRONMENT, 2023, 37 (01) : 43 - 65
  • [30] Incorporating Operational Modes into long-Term Open-Pit Mine Planning Under Geological Uncertainty: An Optimization Combining Variable Neighborhood Descent with Linear Programming
    Quelopana, Aldo
    Navarra, Alessandro
    MINING METALLURGY & EXPLORATION, 2024, : 2769 - 2782