Underground long-term mine production scheduling with integrated geological risk management

被引:37
作者
Carpentier, S. [1 ,2 ]
Gamache, M. [1 ,3 ]
Dimitrakopoulos, R. [2 ,3 ]
机构
[1] Ecole Polytech, Dept Math & Ind Engn, Montreal, PQ, Canada
[2] McGill Univ, Dept Min & Mat Engn, COSMO Stochast Mine Planning Lab, Montreal, PQ, Canada
[3] Res Grp Decis Anal GERAD, Montreal, PQ, Canada
来源
TRANSACTIONS OF THE INSTITUTIONS OF MINING AND METALLURGY SECTION A-MINING TECHNOLOGY | 2016年 / 125卷 / 02期
基金
加拿大自然科学与工程研究理事会;
关键词
Underground mine; Stochastic optimisation; Production scheduling; Long-term-planning; Geological uncertainty;
D O I
10.1179/1743286315Y.0000000026
中图分类号
TD [矿业工程];
学科分类号
0819 ;
摘要
A stochastic integer programming (SIP) model is presented to optimise long-term scheduling of underground mine operations while considering geological uncertainty. To integrate this uncertainty, a set of stochastic simulations is generated, corresponding to representations of the deposit, and is used as primary inputs to optimisation. The two-stage SIP model developed considers a variable cut-off grade and accounts for maximum development, material handling flow conservation, mill and mine capacity, and activity precedencies for an underground nickel mine. The results show that the schedule generated has a higher expected value when considering and managing grade risk. They also demonstrate the benefits of risk control, which this approach allows.
引用
收藏
页码:93 / 102
页数:10
相关论文
共 50 条
  • [1] Integrated stochastic optimization of stope design and long-term underground mine production scheduling
    Furtado e Faria, Matheus
    Dimitrakopoulos, Roussos
    Lopes Pinto, Claudio Lucio
    RESOURCES POLICY, 2022, 78
  • [2] Integrated stochastic optimisation of stope design and long-term production scheduling at an operating underground copper mine
    Andrade, Laura Carelos
    Dimitrakopoulos, Roussos
    Conway, Phil
    INTERNATIONAL JOURNAL OF MINING RECLAMATION AND ENVIRONMENT, 2024, 38 (08) : 619 - 641
  • [3] Integrated short- and medium-term underground mine production scheduling
    Nehring, M.
    Topal, E.
    Kizil, M.
    Knights, P.
    JOURNAL OF THE SOUTHERN AFRICAN INSTITUTE OF MINING AND METALLURGY, 2012, 112 (05) : 365 - 378
  • [4] A new mathematical programming model for long-term production scheduling considering geological uncertainty
    Gholamnejad, J.
    Moosavi, E.
    JOURNAL OF THE SOUTHERN AFRICAN INSTITUTE OF MINING AND METALLURGY, 2012, 112 (02) : 77 - 81
  • [5] Simultaneous integrated optimization for underground mine planning: application and risk analysis of geological uncertainty in a gold deposit
    Hou, Jie
    Li, Guoqing
    Hu, Nailian
    Wang, Hao
    GOSPODARKA SUROWCAMI MINERALNYMI-MINERAL RESOURCES MANAGEMENT, 2019, 35 (02): : 153 - 174
  • [6] Optimization of underground mine access layout and production scheduling
    Hou, Jie
    Li, Guoqing
    Hu, Nailian
    GOSPODARKA SUROWCAMI MINERALNYMI-MINERAL RESOURCES MANAGEMENT, 2020, 36 (02): : 87 - 107
  • [7] Optimisation of long-term quarry production scheduling under geological uncertainty to supply raw materials to a cement plant
    Vu, Trong
    Bao, Tran
    Drebenstedt, Carsten
    Pham, Hien
    Nguyen, Hoai
    Nguyen, Duc
    MINING TECHNOLOGY-TRANSACTIONS OF THE INSTITUTIONS OF MINING AND METALLURGY, 2021, 130 (03) : 146 - 158
  • [8] The Application of Stochastic Mine Production Scheduling in the Presence of Geological Uncertainty
    Joshi, Devendra
    Gholami, Hamed
    Mohapatra, Hitesh
    Ali, Anis
    Streimikiene, Dalia
    Satpathy, Susanta Kumar
    Yadav, Arvind
    SUSTAINABILITY, 2022, 14 (16)
  • [9] Integrated Stochastic Underground Mine Planning with Long-Term Stockpiling: Method and Impacts of Using High-Order Sequential Simulations
    Andrade, Laura Carelos
    Dimitrakopoulos, Roussos
    MINERALS, 2024, 14 (02)
  • [10] Analysis of the truck haulage system in an underground mine using long-term log data
    Park, Sebeom
    Choi, Yosoon
    GEOSYSTEM ENGINEERING, 2024, 27 (04) : 149 - 159